Tender Details
Particulars | Details |
---|---|
Title |
Fixing Of Partition Wall And Repairing Of For Installation Of Air Conditioner At G Block 1st Floor And Pa Section Of Parliamentary Affairs Department At G Block 2nd Floor Within The Compound Of Writers Buildings During The Year 2024 25
|
Description |
Fixing Of Partition Wall And Repairing Of For Installation Of Air Conditioner At G Block 1st Floor And Pa Section Of Parliamentary Affairs Department At G Block 2nd Floor Within The Compound Of Writers Buildings During The Year 2024 25
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_820801_1 |
Reference Number |
WBPWD/EE-I/CTD/NIT84/2024-25 |
Tender Fee | 0 |
EMD | 10668 |
Tender Value | |
Place | Writers Buildings |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1828012 |
Start Date | March 05, 2025 20:30 |
End Date |
11/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of air conditioning machine in office premises within principal establishment section, 1st floor, academic building, deben mahata government medical college and hospital, hatuara, purulia
Supply, installation, testing and commissioning of air conditioning machine in office premises within principal establishment section, 1st floor, academic building, deben mahata government medical college and hospital, hatuara, purulia
Read moreProposed constn. of 50 seated sc girls hostel building (g plus 1 storied) attached to no. 1 harina h.s. sabroom, south tripura under bjrcy under (css) /sh- building portion in/c internal water supply, sanitary installation, sewage and drainage works
(ground floor only)/ sh- constn. of boundary wall with entrance gate along the periphery of the sc girls hostel attached to no.1 harina h.s. at thaibong gp during the year 2024-25
Read moreConstruction of boundary wall and allied works at darukuli, pindrakuli, khas jangal, mantipa 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Construction of boundary wall and allied works at darukuli, pindrakuli, khas jangal, mantipa 1st and 2nd tubewell site of public water supply schemes in jhargram block within jhargram district under jhargram division p.h.e dte.
Read moreSetting up of partition wall including allied electrical works at nursing branch, 1st floor, a block, swasthya bhawan building
Setting up of partition wall including allied electrical works at nursing branch, 1st floor, a block, swasthya bhawan building
Read moreWbkp/cp/nit- 157 / repairing of ceiling and wall of kitchen, bathroom, bedroom and dining room, glasses and inside painting of nowdapara phe, qtr no-01, grnd. flr., block no-a-7 / ten, dated- 24.03.2025
Repairing of ceiling and wall of kitchen, bathroom, bedroom and dining room, glasses and inside painting of nowdapara phe, b. g. ghosh road, kolkata, quarter no-01, ground floor, block no-a-7, during the year 2024-2025.
Read moreWbkp/cp/nit- 155/ repairing of ceiling and wall of kitchen, bathroom, bedrooms, dining room, glasses and inside painting of nawdapara phe, b c ghosh rd, qtr-12, 2nd floor, block-j /ten, dated.24.03.2025
Repairing of ceiling and wall of kitchen, bathroom, bedrooms and dining room, glasses and inside painting of nawdapara phe, b c ghosh rd, qtr-12, 2nd floor, block-j during the year 2024-2025.
Read moreWbkp/cp/nit-151/ repairing of western side boundary wall of the mto, sco compound at 4, pretoria street /ten, dated.24.03.2025
Repairing of western side boundary wall of the mto, sco compound at 4, pretoria street, kolkata-700071, during the year 2024-2025.
Read moreWbkp/cp/nit-156 / repairing of ceiling and wall of kitchen, bathroom, bedroom and dining room, glasses and inside painting of belghoria phe, b. t. road, qtr no-15, 3rd flr, blk no-iv-9 / ten, dated- 24.03.2025
Repairing of ceiling and wall of kitchen, bathroom, bedroom and dining room, glasses and inside painting of belghoria phe, b. t. road, kolkata, quarter no-15, 3rd floor, block no-iv-9, during the year 2024-2025.
Read moreFixing of rate contract for providing of dg sets on per day rent basis for installation at yatri bhawan bhagwati nagar/jhiri mela and other locations within the jurisdiction of electric division-iii during the financial year 2025-26
Fixing of rate contract for providing of dg sets on per day rent basis for installation at yatri bhawan bhagwati nagar/jhiri mela and other locations within the jurisdiction of electric division-iii during the financial year 2025-26
Read moreGeneral-installation of air conditioners in steno pool pa to judges main section and annex section at 2nd floor of new high court building ernakulam. ac work electrical ac work
General-installation of air conditioners in&#x0d steno pool pa to judges main section and&#x0d annex section at 2nd floor of new high court&#x0d building ernakulam.&#x0d ac work electrical ac work
Read moreof your Industry type