Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Z7 Rus 188 77 098 Sb 1 Cable Bundle Sanoet,Z7 Rus 188 77 101 Sb Cable No 2,Z7 Rus 188 77 102 Sb Cab
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5617891 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 18, 2024 21:54 |
| End Date |
Expired
09/12/2024
Expired 673 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Z7/rus-bl2.300. 041 electroblock / electric unit
Z7/rus-bl2.300. 041 electroblock / electric unit
Read moreZ7/rus-bl1.335. 051 sighting & vision system, pnk-4s
Z7/rus-bl1.335. 051 sighting & vision system, pnk-4s
Read moreConstruction of new toilets in existing store room, and painting works at room no-101 and 102 at cc-ii, iit kanpur.
Construction of new toilets in existing store room, and painting works at room no-101 and 102 at cc-ii, iit kanpur.
Read moreIn ward 77 vaishali sector 4, work of laying tiles on the side track from m.no. 101 to s.4 vaishali market gate m.no. 353 by dance.
In ward 77 vaishali sector 4, work of laying tiles on the side track from m.no. 101 to s.4 vaishali market gate m.no. 353 by dance.
Read moreIn ward 81 shakti khand 03, improvement work by cc from man no. 232 to 216, man no. 84 to 79, man no. 102 to 96, 133 to 146 and 163 to 188.
In ward 81 shakti khand 03, improvement work by cc from man no. 232 to 216, man no. 84 to 79, man no. 102 to 96, 133 to 146 and 163 to 188.
Read moreSpl repair of bldg no p-182, t-97, t -98, t-99,t-100,t-101 and t-102 at 11 armd regt and other sanctioned work at nams
Spl repair of bldg no p-182, t-97, t -98, t-99,t-100,t-101 and t-102 at 11 armd regt and other sanctioned work at nams
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreLv1 wzt-3 170-100-023 sb winch frame,lv1 wzt-3 170-100-042 sb-1 drum,lv1 wzt-3 625-09-001z-1 electrical bundle 6 mak,lv1 wzt-3 170-104-002sb-c or 1 auxiliary hoisting winch,lv1 wzt-3 td50-09-008z-2 electrial bundle,y3 wzt-3 misc-625-73-007z- -6 cable no 1 r,y3 wzt-3 misc-625-70-2030-z conductor no 197,y3 wzt-3 misc-625-73-009z-625 cable no 4r
Lv1 wzt-3 170-100-023 sb winch frame,lv1 wzt-3 170-100-042 sb-1 drum,lv1 wzt-3 625-09-001z-1 electrical bundle 6 mak,lv1 wzt-3 170-104-002sb-c or 1 auxiliary hoisting winch,lv1 wzt-3 td50-09-008z-2 electrial bundle,y3 wzt-3 misc-625-73-007z- -6 cable no 1 r,y3 wzt-3 misc-625-70-2030-z conductor no 197,y3 wzt-3 misc-625-73-009z-625 cable no 4r
Read moreSupply and installation of wpc doors with hardware for room no. 201 of size 6.5x2.75,supply and installation of wpc door with frame and all hardware with labour and transportation for room no. 101,supply and installation of wooden main door with all hardware, door closer with labour and transportation for room no. 101 102 103 201 202 and pantry,supply and installation of wpc door with frame and all hardware with labour and transportation for room no. 201 and 102,supply and installation of wpc doors with hardware for room no. 202 of size 6.5x3
Supply and installation of wpc doors with hardware for room no. 201 of size 6.5x2.75,supply and installation of wpc door with frame and all hardware with labour and transportation for room no. 101,supply and installation of wooden main door with all hardware, door closer with labour and transportation for room no. 101 102 103 201 202 and pantry,supply and installation of wpc door with frame and all hardware with labour and transportation for room no. 201 and 102,supply and installation of wpc doors with hardware for room no. 202 of size 6.5x3
Read moreof your Industry type