Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of 04 Nos. 60 Drum Float And 03 Nos. 96 Drum Float And Fabrication Of 01 No. Hdpe Floating Dock Complete For Pump Motor Set, 01 No. Hdpe Floating Dock Complete For Walkway, 02 Nos. Pump Motor Shed And 02 Nos. 24 Drum Float At Gocp Ba
|
Description |
Repairing Of 04 Nos. 60 Drum Float And 03 Nos. 96 Drum Float And Fabrication Of 01 No. Hdpe Floating Dock Complete For Pump Motor Set, 01 No. Hdpe Floating Dock Complete For Walkway, 02 Nos. Pump Motor Shed And 02 Nos. 24 Drum Float At Gocp Ba
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_MCL_328405_1 |
Reference Number |
MCL/PO/ GOCP/EM/e-Proc/2024-25/07 Date-13/02/25 |
Tender Fee | 0 |
EMD | 39400 |
Tender Value | |
Place | GARJANBAHAL OCP BASUNDHARA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340898 |
Start Date | February 14, 2025 15:30 |
End Date |
24/02/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Read moreFabrication of 03 sets of 66 drum pontoon and repairing of 02 sets of old 66 drum pontoon for installation of ht pump 180 lpsx120m head for locp, ib valley area.
Fabrication of 03 sets of 66 drum pontoon and repairing of 02 sets of old 66 drum pontoon for installation of ht pump 180 lpsx120m head for locp, ib valley area.
Read moreRep. and maint. of 03 nos. (one no. 6.6kv and two nos. 3.3kv) ht ohl mines feeders as req for strengthening of 6.6kv and 3.3kv ohl structures one 6.6kv from q.no. 01 sub-stn to mines and other two 3.3kv from q. no. 02 sub-stn to purnadih basti
Rep. and maint. of 03 nos. (one no. 6.6kv and two nos. 3.3kv) ht ohl mines feeders as req for strengthening of 6.6kv and 3.3kv ohl structures one 6.6kv from q.no. 01 sub-stn to mines and other two 3.3kv from q. no. 02 sub-stn to purnadih basti
Read moreDismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area
Dismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area
Read moreConstr of mini tube well 05 nos. with 2.0 h.p. submersible motor pump and s/f of 05 nos. water cooler with accessories an s/f and repairing of led street light, repairing of 01 no. high mast with old led flood light driver acces works at n.m.y. gkp
Constr of mini tube well 05 nos. with 2.0 h.p. submersible motor pump and s/f of 05 nos. water cooler with accessories an s/f and repairing of led street light, repairing of 01 no. high mast with old led flood light driver acces works at n.m.y. gkp
Read moreDay to day operation and maintenance of pump motor set, routine maintenance and repairing of e.i work at bidhannagar east ps, barrack and quarter, salt lake, kolkata-700091, bidhannagar women ps from 01-05-2025 to 31-03- 2026. (2nd call)
Day to day operation and maintenance of pump motor set, routine maintenance and repairing of e.i work at bidhannagar east ps, barrack and quarter, salt lake, kolkata-700091, bidhannagar women ps from 01-05-2025 to 31-03- 2026. (2nd call)
Read moreRepairing of 01 nos 500gpm, 100m head, dsm 125/40 kbl make, and 01 no 500gpm, 5chr, 125/100 type, 150m, mnp make pump for water tanker filling point or mines dewatering purpose at topa project under kuju area.
Repairing of 01 nos 500gpm, 100m head, dsm 125/40 kbl make, and 01 no 500gpm, 5chr, 125/100 type, 150m, mnp make pump for water tanker filling point or mines dewatering purpose at topa project under kuju area.
Read moreS/f of 150 ltr capacity 02 no water cooler 4 kva steblizer construction of water cooler cage boring work s/f of 01 hp submersible pump for 02 nos water cooler controling of streel light by cable and cabling work at smy ghorawal
S/f of 150 ltr capacity 02 no water cooler 4 kva steblizer construction of water cooler cage boring work s/f of 01 hp submersible pump for 02 nos water cooler controling of streel light by cable and cabling work at smy ghorawal
Read moreComplete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area
Complete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area
Read moreFabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area
Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area
Read moreof your Industry type