Tender Details
About Tender
🚇 Construction Project Bid: Gabion Walls, Side Drains, Retaining Walls & Protective Works For Palakkad Division 🛠️🏗️ The Ministry Of Railways, Central Government, Invites Bids For The Construction Of Various Infrastructure Components As Part Of The Palakkad Division Project. This Includes The Construction Of Gabion Walls, Side Drains, Retaining Walls, And Protective Works At Specified Locations Along The Tracks. 📅 Bid Submission Deadline: May 07, 2024, 3:00 Pm A Tender Security Amount Of Inr 10,73,000/ Is Required For Submission. Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents For The Successful Execution Of These Works. Keywords: Construction, Gabion Wall, Side Drains, Retaining Wall, Protective Works, Ministry Of Railways, Infrastructure, Civil Works, Tender, Palakkad DivisionParticulars | Details |
---|---|
Title |
Palakkad Division Construction Of Gabion Wall At Km.181/250 181/100 Rh Side ( Padil Majn ) , Km.180/800 181/050 Lh Side ( Padil Majn) ,Km.0/700 800 Rh Side ( Padil Road 1) Side Drains At Km.181/250 181/340 Lh Side (Padil Majn ), Km.9/200 300 Rh Side ( Padil Jokt ) Retaining Wall At Km.0/750 850 Lh Side ( Padil Road 2), Between Re Mast 8/18 A 8 / 20 A ( Rh Side ) 8 / 200 300 Padil Jokt Section &Amp Protective Work At Ullal Yard Km.877 / 320 420 Rh Side
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74265056 |
Reference Number |
PGT-Works-2024-N07-02 |
Tender Fee | 0 |
EMD | 10.73 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74265056/viewNitPdf_4517800.pdf |
Start Date | March 28, 2024 18:20 |
End Date |
07/05/2024 ( Expired 369 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw-i: rrb- smet section: construction of side drain at km. 41/300-700 (lh & rh), 50/000-200 (lh & rh) 50/500-850 (rh), 53/800-54/700 (rh) for a length of 2.450 kms. sw-ii: smet-tlgp sec construction of side drain lh km 94/500-700, 97/800-98/000, 99/100- 200,99/350-550, 103/500-900, 156/600-800, 157/100-300 & rh side at km 99/100-300, 100/750-850,153/300-800, 156/600-800 for a length of 2.8kms
For complete deion and other details, please refer to tender
Read moreProtection works for vulnerable cutting at km. 0/800-1/000 on both sides between mys-ap stations, km.13/000-300 on both side between blga-ste station and km. 33/900 - 34/200 at krnr yard with gabion walls and galvanised steel wire rope net along with chain-link mesh-netting under aden/i/mys sub-division.
For complete deion and other details, please refer to tender
Read moreRrb-smet: improvements to cess at locations km. 1/180-1/600 (lh), 2/200-2/700 (lh), 4/200-4/500 (lh&rh), 8/400-8/900 (lh&rh), 14/120-15/100 (lh&rh), 25/30-26/000 (lh&rh), 28/650-29/450 (lh&rh), 37/900 45&47 500 (lh&rh), 45/500-45/650 (lh&rh), 46/300-46/400 (lh&rh), 46/500-46/700 (lh&rh), 47/900-48/000 (rh), 49/200-49/300 (lh&rh), 49/700-49/850 (lh&rh), 51/200-51/700 (rh), 52/700-52/950 (lh&rh), 56/600-56/700 (lh&rh), 59/150-59/350 (lh),
For complete deion and other details, please refer to tender
Read morePalakkad division - construction of gabion wall at km.181/250-181/100 - rh side ( padil - majn ) , km.180/800-181/050 - lh side ( padil- majn) ,km.0/700-800 - rh side ( padil road -1) side drains at km.181/250-181/340 - lh side (padil-majn ), km.9/200-300 - rh side ( padil - jokt ) retaining wall at km.0/750-850 lh side ( padil road -2), between re mast 8/18 a - 8 / 20 a ( rh side )- 8 / 200-300 - padil - jokt section & protective work at ullal yard km.877 / 320-420 - rh side
For complete deion and other details, please refer to tender
Read moreRoad safety measures providing and fixing of metal beam crash barrier on rajouri darhal road on different rds km 4th rd 200 240 l 30 mtr km 5th rd 0 250 l 204 mtr km 6th rd 300 350 l 40 mtr 420 480 l 26 mtr 700 750 l 36 mtr 900 950 l 20 mtr km 7th 3
Road safety measures providing and fixing of metal beam crash barrier on rajouri darhal road on different rds km 4th rd 200 240 l 30 mtr km 5th rd 0 250 l 204 mtr km 6th rd 300 350 l 40 mtr 420 480 l 26 mtr 700 750 l 36 mtr 900 950 l 20 mtr km 7th 3
Read moreRestoration of rain damages on lippa to asrang road km. 0/00 to 10/100 (sh- c/o r/wall in g.i. wire crate at rd. 6/200 to 6/230, 6/560 to 6/600, 8/400 to 8/430, r/wall in pcc at rd 4/670 to 4/690, b/wall at rd. 8/360 to 8/435 and 9/800 to 9/820)
Restoration of rain damages on lippa to asrang road km. 0/00 to 10/100 (sh- c/o r/wall in g.i. wire crate at rd. 6/200 to to 6/600, 8/400 to 8/430, r/wall in pcc at rd 4/670 to 4/690, b/wall at rd. 8/360 to 8/435 and 9/800 to 9/820)
Read moreJob 3 construction to link road village gondpur to jaichand to satsang ghar via dyala mohalla tehsil haroli distt una h.p. km. 0-0 to 1-200 sub head c.o 900mm dia double row hume pipe culvert at rd 0-250, c.o edge wall at rd 0-050 to 0-150, providi
Job 3 construction to link road village gondpur to jaichand to satsang ghar via dyala mohalla tehsil haroli distt una h.p. km. 0-0 to 1-200 sub head c.o 900mm dia double row hume pipe culvert at rd 0-250, c.o edge wall at rd 0-050 to 0-150, providi
Read moreof your Industry type