Tender Details

Particulars Details
Title
Operation And Maintenance Of 1100, 1300, 1400 Mm Dia Ms Main Transmission Pipeline From Km 4 (Mandrayal) To Gangapur City Headworks And Cwr At Karauli, Gangapur City Headworks For Supply Drinking Water To 109 Villages Of Package Il, Karauli And Ganga
Description
Operation And Maintenance Of 1100, 1300, 1400 Mm Dia Ms Main Transmission Pipeline From Km 4 (Mandrayal) To Gangapur City Headworks And Cwr At Karauli, Gangapur City Headworks For Supply Drinking Water To 109 Villages Of Package Il, Karauli And Ganga
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2000
EMD 30329
Tender Value
Place EE PHED PROJECT DIVISION KARAULI HQ TODABHIM
Link

AAAAAAAAAA

Login to view
Start Date April 21, 2025 19:30
End Date

01/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Operation and maintenance of 1100, 1300, 1400 mm dia ms main transmission pipeline from km-4 (mandrayal) to gangapur city headworks and cwr at karauli, gangapur city headworks for supply drinking water to 109 villages of package il, karauli and ganga

Operation and maintenance of 1100, 1300, 1400 mm dia ms main transmission pipeline from km-4 (mandrayal) to gangapur city headworks and cwr at karauli, gangapur city headworks for supply drinking water to 109 villages of package il, karauli and ganga

Read more
Construction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal

Construction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal

Read more
State plan-state plan 2024-25- optimization of production and transmission - wss to cheekode and adjoining villages - supply and fixing 900 mm nrv in raw water pumping main-pipeline work

State plan-state plan 2024-25-&amp#x0d optimization of production and transmission -&amp#x0d wss to cheekode and adjoining villages -&amp#x0d supply and fixing 900 mm nrv in raw water&amp#x0d pumping main-pipeline work

Read more
Others-state plan 2023-24-optimisation of production and transmission-pipe replacement- augmentation to bwss relaying the 400 mm damaged ms fabrication work in pumping main at koorangot kadavu pump house.- pipeline work

Others-state plan 2023-24-optimisation of&amp#x0d production and transmission-pipe replacement-&amp#x0d augmentation to bwss relaying the 400 mm&amp#x0d damaged ms fabrication work in pumping&amp#x0d main at koorangot kadavu pump house.-&amp#x0d pipeline work

Read more
Mitigation of sewage outfalls (phase i) package 33a replacement of 900mm dia jbic main by 1000mm dia ci pumping main from padi flyover to kodungaiyur stp supplying and laying of ms encasing pipe of size 1700 mm dia for a length of 70m- trenchless

Mitigation of sewage outfalls (phase i) package 33a replacement of 900mm dia jbic main by 1000mm dia ci pumping main from padi flyover to kodungaiyur stp supplying and laying of ms encasing pipe of size 1700 mm dia for a length of 70m- trenchless

Read more
Laying of raw water pipeline with 150 mm dia gi pipes from rkp oc bore well pipe line near rk-4 gadda main road to old water sump near rkp chp check post and to 1.00 lakh liters capacity rcc water storage tank ( 2 no.s) for dust suppression at rkp chp, mandamarri area.

Laying of raw water pipeline with 150 mm dia gi pipes from rkp oc bore well pipe line near rk-4 gadda main road to old water sump near rkp chp check post and to 1.00 lakh liters capacity rcc water storage tank ( 2 no.s) for dust suppression at rkp chp, mandamarri area.

Read more
Laying of 8 inch dia ms pipeline from main sump to toe of coal stock no. 18 for fire fighting at coal stock no. 18 and for operation of 2000 gpm pump at main sump of kdh ocp, nk area

Laying of 8 inch dia ms pipeline from main sump to toe of coal stock no. 18 for fire fighting at coal stock no. 18 and for operation of 2000 gpm pump at main sump of kdh ocp, nk area

Read more
Operation maintenance of temporary project not included in the original chambal sawai madhopurnadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur city for 12 months

Operation maintenance of temporary project not included in the original chambal sawai madhopurnadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur city for 12 months

Read more
Urgent replacement and repairs to 900 mm dia psc pipeline transmission mains from mbr to mes college junction and 450500 600 700750 mm dia ci pipeline transmission mains at various location from mbr to sada via vasco city

Urgent replacement and repairs to 900 mm dia psc pipeline transmission mains from mbr to mes college junction and 450500 600 700750 mm dia ci pipeline transmission mains at various location from mbr to sada via vasco city

Read more
Repairing of the pillars which are supporting the main water supply pipeline to trout fish farm patlikulh , district kullu (h.p.) (sh providing and laying 5 no. rcc columns for support of existing ms pipe line 600 mm dia damaged during flood)

Repairing of the pillars which are supporting the main water supply pipeline to trout fish farm patlikulh , district kullu (h.p.) (sh providing and laying 5 no. rcc columns for support of existing ms pipe line 600 mm dia damaged during flood)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise