Tender Details
Particulars | Details |
---|---|
Title |
Operation And Maintenance Of 1100, 1300, 1400 Mm Dia Ms Main Transmission Pipeline From Km 4 (Mandrayal) To Gangapur City Headworks And Cwr At Karauli, Gangapur City Headworks For Supply Drinking Water To 109 Villages Of Package Il, Karauli And Ganga
|
Description |
Operation And Maintenance Of 1100, 1300, 1400 Mm Dia Ms Main Transmission Pipeline From Km 4 (Mandrayal) To Gangapur City Headworks And Cwr At Karauli, Gangapur City Headworks For Supply Drinking Water To 109 Villages Of Package Il, Karauli And Ganga
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 30329 |
Tender Value | |
Place | EE PHED PROJECT DIVISION KARAULI HQ TODABHIM |
Link |
AAAAAAAAAA Login to view |
Start Date | April 21, 2025 19:30 |
End Date |
01/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of 1100, 1300, 1400 mm dia ms main transmission pipeline from km-4 (mandrayal) to gangapur city headworks and cwr at karauli, gangapur city headworks for supply drinking water to 109 villages of package il, karauli and ganga
Operation and maintenance of 1100, 1300, 1400 mm dia ms main transmission pipeline from km-4 (mandrayal) to gangapur city headworks and cwr at karauli, gangapur city headworks for supply drinking water to 109 villages of package il, karauli and ganga
Read moreConstruction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal
Construction of rcc pedestal (114 nos) for 500 mm dia ms pipe line total length-510 mtr (reach from 1180 mtr to 1220 mtr and from 1300 mtr to 1770 mtr upto ganchha minor 1) in main canal of new ramjanki pump canal
Read moreState plan-state plan 2024-25- optimization of production and transmission - wss to cheekode and adjoining villages - supply and fixing 900 mm nrv in raw water pumping main-pipeline work
State plan-state plan 2024-25-&#x0d optimization of production and transmission -&#x0d wss to cheekode and adjoining villages -&#x0d supply and fixing 900 mm nrv in raw water&#x0d pumping main-pipeline work
Read moreOthers-state plan 2023-24-optimisation of production and transmission-pipe replacement- augmentation to bwss relaying the 400 mm damaged ms fabrication work in pumping main at koorangot kadavu pump house.- pipeline work
Others-state plan 2023-24-optimisation of&#x0d production and transmission-pipe replacement-&#x0d augmentation to bwss relaying the 400 mm&#x0d damaged ms fabrication work in pumping&#x0d main at koorangot kadavu pump house.-&#x0d pipeline work
Read moreMitigation of sewage outfalls (phase i) package 33a replacement of 900mm dia jbic main by 1000mm dia ci pumping main from padi flyover to kodungaiyur stp supplying and laying of ms encasing pipe of size 1700 mm dia for a length of 70m- trenchless
Mitigation of sewage outfalls (phase i) package 33a replacement of 900mm dia jbic main by 1000mm dia ci pumping main from padi flyover to kodungaiyur stp supplying and laying of ms encasing pipe of size 1700 mm dia for a length of 70m- trenchless
Read moreLaying of raw water pipeline with 150 mm dia gi pipes from rkp oc bore well pipe line near rk-4 gadda main road to old water sump near rkp chp check post and to 1.00 lakh liters capacity rcc water storage tank ( 2 no.s) for dust suppression at rkp chp, mandamarri area.
Laying of raw water pipeline with 150 mm dia gi pipes from rkp oc bore well pipe line near rk-4 gadda main road to old water sump near rkp chp check post and to 1.00 lakh liters capacity rcc water storage tank ( 2 no.s) for dust suppression at rkp chp, mandamarri area.
Read moreLaying of 8 inch dia ms pipeline from main sump to toe of coal stock no. 18 for fire fighting at coal stock no. 18 and for operation of 2000 gpm pump at main sump of kdh ocp, nk area
Laying of 8 inch dia ms pipeline from main sump to toe of coal stock no. 18 for fire fighting at coal stock no. 18 and for operation of 2000 gpm pump at main sump of kdh ocp, nk area
Read moreOperation maintenance of temporary project not included in the original chambal sawai madhopurnadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur city for 12 months
Operation maintenance of temporary project not included in the original chambal sawai madhopurnadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur city for 12 months
Read moreUrgent replacement and repairs to 900 mm dia psc pipeline transmission mains from mbr to mes college junction and 450500 600 700750 mm dia ci pipeline transmission mains at various location from mbr to sada via vasco city
Urgent replacement and repairs to 900 mm dia psc pipeline transmission mains from mbr to mes college junction and 450500 600 700750 mm dia ci pipeline transmission mains at various location from mbr to sada via vasco city
Read moreRepairing of the pillars which are supporting the main water supply pipeline to trout fish farm patlikulh , district kullu (h.p.) (sh providing and laying 5 no. rcc columns for support of existing ms pipe line 600 mm dia damaged during flood)
Repairing of the pillars which are supporting the main water supply pipeline to trout fish farm patlikulh , district kullu (h.p.) (sh providing and laying 5 no. rcc columns for support of existing ms pipe line 600 mm dia damaged during flood)
Read moreof your Industry type