Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Solar Operated Drinking Water Facilities
|
Description |
Construction Of Solar Operated Drinking Water Facilities With Storage System Including Sinking Tube Well And Solar Panel With 1.5 Hp Submergible Pump Motor Including Auto Panel In Different Location Under Cooch Behar Municipality
|
Organisation | Government of West Bengal |
Tender Id | 2023_MAD_547338_1 |
Reference Number |
COOCH BEHAR/PWD/ 49 / 2023-24 Dt. 13-07-23 |
Tender Fee | 0 |
EMD | 69146 |
Tender Value | |
Place | Cooch Behar Municipality |
Link | https://wbtenders.gov.in |
Start Date | July 14, 2023 20:30 |
End Date |
31/07/2023 ( Expired 688 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreLeasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreAllotment of about 5 acres of port land for construction of mega modern shopping mallwith multiplexat marine drive roadin the port townshipfor a period of 30 (thirty) years on long term lease basis.
Allotment of about 5 acres of port land for construction of mega modern shopping mallwith multiplexat marine drive roadin the port townshipfor a period of 30 (thirty) years on long term lease basis.
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreAppointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Appointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Read moreof your Industry type