Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
06/Ce/Gnr/2024 25
|
| Description |
Setting Up Of South Asian Paralympic Center (Sapc) At Sai, Nswc, Gandhinagar Sh: C/O Hostel Block And Dining Hall Including Development Works. (Balance Work At Risk And Cost) And Other Misc. Works.
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 84652 |
|
Reference Number |
06/CE/GNR/2024-25 |
| Tender Fee | 0 |
| EMD | 4.59 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642438343635322430362f43452f474e522f323032342d3235 |
| Start Date | August 07, 2024 20:09 |
| End Date |
Expired
14/08/2024
Expired 794 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of balance punchlist item and maintenance works at risk n cost of 6 laning of bhubaneswar jagatpur chandikhole of nh 16 in the state of odisha
Execution of balance punchlist item and maintenance works at risk n cost of 6 laning of bhubaneswar jagatpur chandikhole of nh 16 in the state of odisha
Read moreConstruction of 350 qtrs for port employees and also to facilitate and reserve land for the future expansion of the port in nuabazar area_1st phase 91 qtrs balance work risk and cost
Construction of 350 qtrs for port employees and also to facilitate and reserve land for the future expansion of the port in nuabazar area_1st phase 91 qtrs balance work risk and cost
Read moreExecution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreCapacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Read moreJjm madhopur ps kotkasim balance work risk and cost
Jjm madhopur ps kotkasim balance work risk and cost
Read moreJjm tohri ps kishangarhbass balance work on risk and cost
Jjm tohri ps kishangarhbass balance work on risk and cost
Read moreJjm jhiryana ps kotkasim balance work on risk and cost
Jjm jhiryana ps kotkasim balance work on risk and cost
Read moreJjm khoha ps kishangarhbass balance work on risk and cost
Jjm khoha ps kishangarhbass balance work on risk and cost
Read moreof your Industry type