Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Transportation And Shifting Of Material From U.G. To Surface Like Transformer, Auxiliary Fan, Geb, Main Acb And Armoured Cable Of Seam D At Bijuri Colliery.
|
Description |
Dismantling, Transportation And Shifting Of Material From U.G. To Surface Like Transformer, Auxiliary Fan, Geb, Main Acb And Armoured Cable Of Seam D At Bijuri Colliery.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_328226_1 |
Reference Number |
AGM/HSD/SO(M)/e-Tend/24-25/152 dtd 08.02.2025 |
Tender Fee | 0 |
EMD | 15700 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340216 |
Start Date | February 08, 2025 23:30 |
End Date |
20/02/2025 ( Expired 60 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Read moreErection and dismantling of poles due to shifting of high wall machine from t3 trench to t2 trench for a period of 06 months at sharda ocm of sohagpur area secl
Erection and dismantling of poles due to shifting of high wall machine from t3 trench to t2 trench for a period of 06 months at sharda ocm of sohagpur area secl
Read moreShifting and dismantling of existing line and transformer from submergence of kochi mi project and supplying, erecting, testing , commissioning 11 kv ht and lt line with transformer at. kochi tq. ghatnji dist. yavatmal and handing over to msedcl.
Shifting and dismantling of existing line and transformer from submergence of kochi mi project and supplying, erecting, testing , commissioning 11 kv ht and lt line with transformer at. kochi tq. ghatnji dist. yavatmal and handing over to msedcl.
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreShifting of lt panel, cable and connected work from cce project site to csd canteen road for bank, csd and security office bldg in technical area at dmsrde kanpur
Shifting of lt panel, cable and connected work from cce project site to csd canteen road for bank, csd and security office bldg in technical area at dmsrde kanpur
Read moreShifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreRequirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra
Requirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra
Read moreProvn of ring main ht cable for ins netajii subhas and shifting of comnetch (kol) from rashbihari builing (p-09) to new admin building under ge (i) (cgn) kolkata
Provn of ring main ht cable for ins netajii subhas and shifting of comnetch (kol) from rashbihari builing (p-09) to new admin building under ge (i) (cgn) kolkata
Read moreof your Industry type