Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
In Stem Construction Of Toilet On The Second Floor Of Laboratory Buiilding
|
| Description |
In Stem Construction Of Toilet On The Second Floor Of Laboratory Building
|
| Organisation | Institute for Stem Cell Science and Regenerative Medicine | Autonomous Bos |
| Tender Id | 317 |
|
Reference Number |
inStem/Maint/Civil/15021/4/NIeT84/2024-25 |
| Tender Fee | 0 |
| EMD | 15836 |
| Tender Value | - |
| Place | InStem-Civil Engineering Section-Karnataka-Bangalore Urban |
| Link |
View Original Tender Notice
https://dbt.ewizard.in/ |
| Start Date | March 07, 2025 23:12 |
| End Date |
Expired
25/03/2025
Expired 549 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreInstem construction of toilet on the second floor of the laboratory building
Instem construction of toilet on the second floor of the laboratory building
Read moreInstem proposed construction of the chemical hood facility on the third floor of the laboratory building
Instem proposed construction of the chemical hood facility on the third floor of the laboratory building
Read moreRenovation of laboratory room (no.s12) on the second floor in the department of physics
Renovation of laboratory room (no.s12) on the second floor in the department of physics
Read moreInstem -interior works - supply and installation of laboratory furnitures for the proposed construction of chemical hood facility at third floor of
Instem-interior works - supply and installation of laboratory furnitures for the proposed construction of chemical hood facility at third floor of laboratory building
Read moreConstruction work for a hall on the second floor of the ada office
Construction work for a hall on the second floor of the ada office
Read moreFabrication of aluminum partition for aee room on the first floor and laboratory room on the second floor of office building of tapi division, cwc, surat
Fabrication of aluminum partition for aee room on the first floor and laboratory room on the second floor of office building of tapi division, cwc, surat
Read moreof your Industry type