Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvements To Shenit To Bhbulwandi Road (Shenit) Km 0/00 To 5/00, Tal.Akole,Dist.Ahmednagar
|
| Description |
Improvements To Shenit To Bhbulwandi Road (Shenit) Km 0/00 To 5/00, Tal.Akole,Dist.Ahmednagar
|
| Organisation | Public Works Region | State Govt. and UT |
| Tender Id | 2024_PWR_1049271_1 |
|
Reference Number |
PWD SGM/ Notice No.01 for 2024-2025-3 |
| Tender Fee | 1180 |
| EMD | 1.5 Lakh |
| Tender Value | |
| Place | TAL.Akole |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832446 |
| Start Date | July 09, 2024 15:30 |
| End Date |
Expired
16/07/2024
Expired 716 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreInitial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Initial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreof your Industry type