Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manufacturing Of Modular Transportation Set For Shifting Of Aircraft Components/Aggregates
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/5785206 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 06, 2025 15:52 |
| End Date |
Expired
27/01/2025
Expired 629 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Manufacturing of trolley for aircraft lifting sling at inas 313
Manufacturing of trolley for aircraft lifting sling at inas 313
Read moreManufacturing of cnc machining components of pump and motor for 2kw lcm
Manufacturing of cnc machining components of pump and motor for 2kw lcm
Read moreManufacturing and supplying of wheel carts for transportation of solid waste 200 no.
Manufacturing and supplying of wheel carts for transportation of solid waste 200 no.
Read moreTransportation - shifting of laterite heaped at the abdul khadar site, guruvanam to dic site guruvanam kasaragod
Transportation /shifting of laterite heaped at the abdul khadar site, guruvanam to dic site guruvanam kasaragod (approx quantity 20,000 mt)
Read moreDesign engineering manufacturing factory testing supply transportation and supervision on installation and commissioning of 33kv 1250a indoor vcb switchgear 7 panel set
Design engineering manufacturing factory testing supply transportation and supervision on installation and commissioning of 33kv 1250a indoor vcb switchgear 7 panel set
Read moreCustom bid for services - transportation loading unloading installation extension dismantling and shifting of complete pony belt drivehead belt structure pvcbelt electrical and associated accessories including extension and tail end shifting of belts..
Custom bid for services - transportation loading unloading installation extension dismantling and shifting of complete pony belt drivehead belt structure pvcbelt electrical and associated accessories including extension and tail end shifting of belts..
Read moreTransportation of bricks from in-house fly-ash bricks manufacturing plant on wrd land in village ramgarh, tehsil balachaur to the delivery site including loading and unloading. and transportation of fly-ash from ggsstp ropar to in-house fly-ash brick
Transportation of bricks from in-house fly-ash bricks manufacturing plant on wrd land in village ramgarh, tehsil balachaur to the delivery site including loading and unloading. and transportation of fly-ash from ggsstp ropar to in-house fly-ash brick
Read moreConsultancy services for assessment of load carrying capacity and structural soundness of existing bridges, including bearings, expansion joints, and allied components, along with feasibility study for transportation and maneuverability of over
Dimensional consignments (ht-03) of 12-axle configuration carrying approx 100 tonne wire ropes on bridge approaches and curves for the kedarnath and hemkund sahib ropeway projects on rudraprayag-sonprayag (nh-107) and rishikesh-govindghat (nh-07
Read moreDesign, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Design, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Read more9030c26e07- requirement for the supply of the package which involves design, engineering, manufacturing, testing, supply, transportation, execution of shutdown works, supervision of non-shutdown works and commissioning of high-speed electric motor
9030c26e07- requirement for the supply of the package which involves design, engineering, manufacturing, testing, supply, transportation, execution of shutdown works, supervision of non-shutdown works and commissioning of high-speed electric motor
Read moreof your Industry type