Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hiring Of 1 No. 0.75 To 1 Cu.M Long Boom Shovel
|
| Description |
Hiring Of 1 No. 0.75 To 1 Cu.M Long Boom Shovel With 12 Meters Boom Length For De Silting Of Jallaram Vagu, Diverted Nallah, Settling Ponds And Garland Drains Near External Dumps At Ocp3, Rg2 For A Period Of Two Years
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 645757 |
|
Reference Number |
ER225O0162 |
| Tender Fee | 2372 |
| EMD | 67000 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | November 22, 2025 22:30 |
| End Date |
Expired
15/12/2025
Expired 304 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreHiring of 0.50 to 0.75 cu.m bucket capacity long boom shovel of 16 mtr. length boom for removal of jam in gl bunkers, to clear stones in feeder breaker hoppers and to clear nallahs near ocp3 chp, rg2 area with 24 hours availability per day and minimum 200 hours per month for 24 months.
Hiring of 0.50 to 0.75 cu.m bucket capacity long boom shovel of 16 mtr. length boom for removal of jam in gl bunkers, to clear stones in feeder breaker hoppers and to clear nallahs near ocp3 chp, rg2 area with 24 hours availability per day and minimum 200 hours per month for 24 months.
Read moreRepairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Read moreSupply and installation of boom stick for rfid based boom barrier system
Supply and installation of boom stick for rfid based boom barrier system
Read moreof your Industry type