Tender Details

Particulars Details
Title
Construction Of Retaining Wall With Piling Adjacent To New Apron At Vsi Airport Port Blair
Description
Construction Of Retaining Wall With Piling Adjacent To New Apron At Vsi Airport Port Blair
Organisation Central Public Procurement Portal 2
Tender Id 2023_AAI_157553_1
Reference
Number
AAI/ENGG(C)/PB /RETAINING WALL /23-24
Tender Fee 3540
EMD 22.2 Lakh
Tender Value -
Place VSI Airport Portblair
Link
View Original Tender Notice

https://etenders.gov.in

Start Date August 09, 2023 16:30
End Date
Expired 29/08/2023

Expired 1141 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Augmentation of apron flood lighting at new apron, kolhapur airport

Augmentation of apron flood lighting at new apron, kolhapur airport

Read more
Painting of runway, taxiway and apron marking at m p airport, udaipur

Painting of runway, taxiway and apron marking at m p airport, udaipur

Read more
Operation and maintenance of 11/0.440 kv substation, perimeter, apron flood lighting and bhs system at shirdi airport

Operation and maintenance of 11/0.440 kv substation, perimeter, apron flood lighting and bhs system at shirdi airport

Read more
Custom bid for services - clearing and forwarding of ship spares at kolkata airport/ sea port

Custom bid for services - clearing and forwarding of ship spares at kolkata airport/ sea port

Read more
Construction of lane drain fho gm tantary up to main road at old airport lane adjacent to northern febricators rangreth humhama.

Construction of lane drain fho gm tantary up to main road at old airport lane adjacent to northern febricators rangreth humhama.

Read more
Project management consultancy services for construction of new integrated terminal building and allied works including extension of apron at srinagar airport (2nd call)

Project management consultancy services for construction of new integrated terminal building and allied works including extension of apron at srinagar airport (2nd call)

Read more
S/r such as construction of compound wall with retaining wall at jeypore airport for the year 2026-27 (roads)

S/r such as construction of compound wall with retaining wall at jeypore airport for the year 2026-27 (roads)

Read more
Provn of retaining wall behind bldg no t-244 t-243 t-242 t-241 and adjacent bldg no t-288 t-249 t-250 t--251 xxxxx under age (i) zakhama

Provn of retaining wall behind bldg no t-244 t-243 t-242 t-241 and adjacent bldg no t-288 t-249 t-250 t--251 xxxxx under age (i) zakhama

Read more
Appointment of consultant for preparation of detailed techno economic feasibility study and bid process management for development of greenfield offshore international airport at kore, vadhavan port region in palghar district, maharashtra (revised)

Appointment of consultant for preparation of detailed techno economic feasibility study and bid process management for development of greenfield offshore international airport at kore, vadhavan port region in palghar district, maharashtra (revised)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise