Tender Details
Particulars | Details |
---|---|
Title |
Wbmad/Mm/Nit 26e/2023 24/4
|
Description |
Construction Of C.C. Road With Rcc Cover Slab Near Shibalay Apartment At Sukantanagar 4no. Sarani And Different Places In Ward No. 27 Under Madhyamgram Municipality.
|
Organisation | Government of West Bengal |
Tender Id | 2023_MAD_625529_4 |
Reference Number |
WBMAD/MM/NIT-26e/2023-24 |
Tender Fee | 0 |
EMD | 4991 |
Tender Value | |
Place | MADHYAMGRAM MUNICIPALITY |
Link | https://wbtenders.gov.in |
Start Date | December 20, 2023 16:30 |
End Date |
18/01/2024 ( Expired 485 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreConstruction work of c.c. road and cross drain in sankat mochan gali, anil gali, chaurasia lodge gali and panchmukhi hanuman gali in jawaharganj ward, sagar-parshad nidhi
Construction work of c.c. road and cross drain in sankat mochan gali, anil gali, chaurasia lodge gali and panchmukhi hanuman gali in jawaharganj ward, sagar-parshad nidhi
Read moreof your Industry type