Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Rewinding Of 17.5 To 20 H.P. 3 Phase 380 400 Volt Induction Motors
|
Description |
Repairing And Rewinding Of 17.5 To 20 H.P. 3 Phase 380 400 Volt Induction Motors For Different Rli Schemes Under Champadanga (A M) Sub Division Under Chinsurah (A M) Division Under Non Plan Programme In The District Of Hooghly
|
Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
Tender Id | 2025_WRDD_816454_9 |
Reference Number |
WBWRDD/EEAM/CNS/CS /eNIT-30 of 2024-25 |
Tender Fee | 0 |
EMD | 10500 |
Tender Value | |
Place | Hooghly |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1816254 |
Start Date | February 19, 2025 16:30 |
End Date |
28/02/2025 ( Expired 106 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreOne time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreProviding road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana
Providing road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana
Read moreRepairing and renovation work of quarters from a43 to a66 at khanij vihar colony, mecl, nagpur.
Repairing and renovation work of quarters from a43 to a66 at khanij vihar colony, mecl, nagpur.
Read moreSelection of contractor for design, manufacture, supply and commissioning of 20 electric buses & 10 chargers for supply to nepal
Selection of contractor for supply and commissioning of 20 electric buses with 10 chargers for supply to nepal
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreRegarding supply of a city tractor 55 h.p. complete with front loader and backhoe tractor jcb to the municipal
Regarding supply of a city tractor 55 h.p. complete with front loader and backhoe tractor jcb to the municipal
Read moreof your Industry type