Tender Details

Particulars Details
Title
Construction Of Concrete Road From Fulmoni Ashwathama Bera House (Danga) To Rukni Rajpahari Pmgsy Road Under Patina Gp, In Nayagram Block, District Jhargram
Description
Construction Of Concrete Road From Fulmoni Ashwathama Bera House (Danga) To Rukni Rajpahari Pmgsy Road Under Patina Gp, In Nayagram Block, District Jhargram
Organisation DISTRICT MAGISTRATE JHARGRAM | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 1.94 Lakh
Tender Value
Place Nayagram
Link

AAAAAAAAAA

Login to view
Start Date June 27, 2025 15:30
End Date

19/07/2025 ( 21 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Construction of rob at railway crossing on roteda to sogariya road in district kota

Construction of rob at railway crossing on roteda to sogariya road in district kota

Read more
Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise