Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Premonsoon Work 2025 26 Emergency Removal Of Accumulated Debris Water Weeds And Plastic Materials At Mangotta In Pamba River Near Mp Palam Connecting Cheruthana And Edathua Panchayath
|
| Description |
Removing All The Organic Inorganic Plastic And Silt Materials Deposited Near The&Amp#X0d
Structures In Rivers At Different Places During The Flood Using Hydraulic Excavators
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_766665_1 |
|
Reference Number |
IRR/IA/TR/2645/2025_5_1_1/1 |
| Tender Fee | 560 |
| EMD | 6325 |
| Tender Value | - |
| Place | Edathua Panchayath |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1249828 |
| Start Date | May 28, 2025 19:00 |
| End Date |
Expired
31/05/2025
Expired 500 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pre monsoon works 2024 emergency removal of accumulated debris water weeds and plastic materials at mangotta in pamba river near mp palam connecting cheruthana and edathua panchayath nbsp
Removing waste
Read moreGeneral pre mansoon work emergency removal of accumulated debries water weeds and plastic materials at mangotta in pampa river near mp palam connecting cheruthana and edathua panchayath.
Removing waste
Read moreDesilting side stabilization work mangotta pamba river from forest depot to pachapally in veeyapuram panchayath and edathua panchayth
General desilting side stabilization work deepening formation of bund and stabilization by using geotextile in mangotta pamba river from forest depot to pachapally in veeyapuram panchayath and edathua panchayth in kuttanad lac general civil work
Read morePremonsoon preparationsremoval of accumulated debris water weeds and plastic materials branches of trees underneath kollukadavu bridge across achenkovil river at thazhakkara panchayth of mavelikara lac
Removal of waste
Read morePremonsoon preparations removal of accumulated debris water weeds and plastic materials branches of trees underneath kunnam railway over bridge across achenkovil river at thazhakkara panchayth of mavelikara lac
Removal of waste
Read moreEmergency deepening desilting and removal of accumulated debris jungle branches of trees and wastes underneath palakkalathil bridge across pampa river at edathua grama panchayath of kuttanad lac
Deepening desilting and removal of accumulated debris
Read moreRetender -general premonsoon work 2025-26 clearing jungle,pothole filling and accumulated debris removal in various bridges under mannarkkad section.
Retender -general premonsoon work 2025-26 clearing jungle,pothole filling and accumulated debris removal in various bridges under mannarkkad section.&#x0d &#x0d
Read moreGeneral pre monsoon work 25 26 adukkalappuram paalam emergency removal of accumulated debris water weeds plastic materials and branches of trees at puthanar in achenkovil river near adukkalappuram paalam in chennithala thripperumthura panchayath
General pre monsoon work 25 26 adukkalappuram paalam emergency removal of accumulated debris water weeds plastic materials and branches of trees at puthanar in achenkovil river near adukkalappuram paalam in chennithala thripperumthura panchayath
Read moreGeneral pre monsoon work 2025 26 kunnam emergency removal of accumulated debris water weeds and plastic materials branches of trees underneath kunnam railway over bridge across achenkovil river at thazhakkara panchayth of mavelikara lac general
General pre monsoon work 2025 26 kunnam emergency removal of accumulated debris water weeds and plastic materials branches of trees underneath kunnam railway over bridge across achenkovil river at thazhakkara panchayth of mavelikara lac general
Read moreClearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris
Clearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris
Read moreof your Industry type