Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
81 Mm Mortar He Dummy Full Model And Material,81 Mm Mortar Smk Dummy Full Model And Material,81 Mm
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5907343 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 06, 2025 02:05 |
End Date |
26/02/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreWork of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division lalganj pratapgarh on semi turnkey basis including loading and unloading of material.
Work of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division lalganj pratapgarh on semi turnkey basis including loading and unloading of material.
Read moreWork of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division raniganj pratapgarh on semi turnkey basis including loading and unloading of material.
Work of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division raniganj pratapgarh on semi turnkey basis including loading and unloading of material.
Read moreWork of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division kunda pratapgarh on semi turnkey basis including loading and unloading of material.
Work of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division kunda pratapgarh on semi turnkey basis including loading and unloading of material.
Read moreWork of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division pratapgarh on semi turnkey basis including loading and unloading of material.
Work of full deposit scheme mp mla fund and other various deposit schemes done through running contract under electricity distribution division pratapgarh on semi turnkey basis including loading and unloading of material.
Read moreSitc of kbl rotating assembly of pump model up 250 38, 180 hp motor and 250 mm nrv at gazdar pumping station installed in k w ward andheri west
Sitc of kbl rotating assembly of pump model up 250 38, 180 hp motor and 250 mm nrv at gazdar pumping station installed in k w ward andheri west
Read moreProviding laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1
Providing laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1
Read moreProviding,laying and jointing of 100 mm dia di pipe line (class k 9) with rider connection complete with labor and material at site morar ost to district hospital morar.file no.193/25x9/1.
Providing,laying and jointing of 100 mm dia di pipe line (class k 9) with rider connection complete with labor and material at site morar ost to district hospital morar.file no.193/25x9/1.
Read moreSupply and installation of he-ne laser module q101 b, part no. i22775, make bruker critical spare for bruker ftir model vertex 70v
Supply and installation of he-ne laser module q101 b, part no. i22775, make bruker critical spare for bruker ftir model vertex 70v
Read moreDrilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Drilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Read moreof your Industry type