Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of Smart Meters From Existing Bare Conductor To Lt Ab Cable In Various Sub Divisions Of Ediv Khanyar (Under Ut Capex2026 27 Shifting Of Meters Pddss2526100329
|
| Description |
Shifting Of Smart Meters From Existing Bare Conductor To Lt Ab Cable In Various Sub Divisions Of Ediv Khanyar (Under Ut Capex2026 27 Shifting Of Meters Pddss2526100329
|
| Organisation | DC-PDD | CE-M and RE Wing Kashmir | CIRCLE I-Srinagar |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1000 |
| EMD | 60000 |
| Tender Value | 30 Lakh |
| Place | Jammu and Kashmir |
| Link | Login to view |
| Start Date | September 28, 2026 21:30 |
| End Date |
Open
21/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of ht trivector smart energy meters, lt ct op smart meters with built in communication part2 of ct ratio 125 5a with and without pp box
Procurement of ht trivector smart energy meters, lt ct op smart meters with built in communication part2 of ct ratio 125 5a with and without pp box
Read moreConversion of bare lt conductor into ab cables and installation of hvds in marshy (dal lake area) of buchwara feeder f03 of 2x10 mva receiving station buchwara under capex budget 2026-27
Conversion of bare lt conductor into ab cables and installation of hvds in marshy (dal lake area) of buchwara feeder f03 of 2x10 mva receiving station buchwara under capex budget 2026-27
Read moreReplacement of existing 440 v, 3- phase bare conductor with lt aerial bunched cable on the existing lattice structure at samdong colony
Replacement of existing 440 v, 3- phase bare conductor with lt aerial bunched cable on the existing lattice structure at samdong colony
Read moreReplacement of bare conductor by lt ab cable
Replacement of bare conductor by lt ab cable under ut capex 2023-24 on partial turnkey basis
Read moreReplacement of bare conductor by lt ab cable
Replacement of bare conductor by lt ab cable&#x0d under ut capex 2023-24&#x0d
Read morePddss2022100402-replacement of bare conductor by lt ab cable for ed
Pddss2022100402-replacement of bare conductor by lt ab cable for ed&#x0d bandipora
Read moreReplacement of bare conductor by lt ab cable for ed handwara
Replacement of bare conductor by lt ab cable for ed handwara
Read moreReplacement of bare conductor by lt ab cable for ed kulgam
Replacement of bare conductor by lt ab cable for ed kulgam
Read moreReplacement of bare conductor by lt ab cable at jasco colony
Replacement of bare conductor by lt ab cable at jasco colony
Read moreReplacements of bare conductor with lt ab cable and strengthening of lt line under edd nautanwa
Replacements of bare conductor with lt ab cable and strengthening of lt line under edd nautanwa
Read moreof your Industry type