Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Jahajpura Canal To 6 R Canal Parral Road Length 3.00 Km Pac 211.40 Lakh Sor 25.03.2022 First Call Time 300 Days
|
| Description |
Construction Of Jahajpura Canal To 6 R Canal Parral Road Length 3.00 Km
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_283083_1 |
|
Reference Number |
08/2023-24 |
| Tender Fee | 15000 |
| EMD | 2.11 Lakh |
| Tender Value | |
| Place | CE (BPB) PWD Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 10, 2023 16:00 |
| End Date |
Expired
23/06/2023
Expired 1108 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of jahajpura canal to 6r canal parral road length 3.00 km pac 211.40 lakh sor 25.03.2022 second call time 300 days
Construction of jahajpura canal to 6r canal parral road length 3.00 km
Read moreConstruction of road from mogra to berakhedi road length 3.00 km pac 254.03 lakh sor 25.03.2022 first call time 300 days
Construction of road from mogra to berakhedi road length 3.00 km
Read moreConstruction of main road to rehti soyat ramnagar road length 3.00 km pac 138.84 lakh sor 25.03.2022 first call time 300 days
Construction of main road to rehti soyat ramnagar road length 3.00 km
Read moreConstruction of road from mogra to simrai nahar road length 3.00 km pac 205.40 lakh sor 25.03.2022 time 300 days first call
Construction of road from mogra to simrai nahar road length 3.00 km
Read moreConstruction of jahajpura to hanuman temple road length 0.50 km pac 35.88 lakh sor 25.03.2022 first call time 180 days
Construction of jahajpura to hanuman temple road length 0.50 km
Read moreof your Industry type