Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supplying And Making Indoor And Outdoor Cable End Termination With Heat Shrinkable Jointing Kit Of 11 Kv Grade 3 Core Xlpe Aluminium Cable At Bhuli Township Power Supply.
|
| Description |
Supplying And Making Indoor And Outdoor Cable End Termination With Heat Shrinkable Jointing Kit Of 11 Kv Grade 3 Core Xlpe Aluminium Cable At Bhuli Township Power Supply.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_294016_1 |
|
Reference Number |
BCCL/KB/EandM/PS/2023-24/29 Dt.-17/11/2023 |
| Tender Fee | - |
| EMD | 763 |
| Tender Value | - |
| Place | Office of CM(EnM)P/S, Bhuli |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 18, 2023 14:30 |
| End Date |
Expired
27/11/2023
Expired 1052 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of heat shrinkable straight jointing kit required for jointing of 11kv, 3c x 240 sq.mm. alu. conductor, wire armoured xlpe cable.
Procurement of heat shrinkable straight jointing kit required for jointing of 11kv, 3c x 240 sq.mm. alu. conductor, wire armoured xlpe cable.
Read moreHeat shrinkable type, cable end termination kits suitable for three core 11 kv xlpe cables
Heat shrinkable type, cable end termination kits suitable for three core 11 kv xlpe cables
Read moreSupply of required led lighting consumables ,insulation tapes and 11kv,1 core x 70 sq.mm ,aluminium xlpe cable,heat shrinkable straight through joint kits for essd and lt and ht lighting section of power house at slbhes
Supply of required led lighting consumables ,insulation tapes and 11kv,1 core x 70 sq.mm ,aluminium xlpe cable,heat shrinkable straight through joint kits for essd and lt and ht lighting section of power house at slbhes
Read moreRepairing the damages of 220kv 1000sqmm xlpe power cable b phase gis termination cable sealing end and attending sf-6 gas leakage in d06 bay and refilling of 1000sqmm gis indoor cable termination of 220kv gis transport hub to mau ckt.-2 bay
Repairing damages of 220kv 1000sqmm xlpe power cable b phase gis termination cable sealing end and attending sf-6 gas leakage in d06 bay and refilling of 1000sqmm gis indoor cable termination of 220kv gis transport hub to mau bay ckt-2
Read moreBifurcation of the existing 11kv dnm colony feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv capacitor bank breaker and laying of 0.5 km 11kv 3x300 sqmm xlpe ug cable (double run) in sanathnagar section of sanathnagar subdivision in greenlands division and the work will be executed by the construction wing of banjara hills circle
Bifurcation of the existing 11kv dnm colony feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv capacitor bank breaker and laying of 0.5 km 11kv 3x300 sqmm xlpe ug cable (double run) in sanathnagar section of sanathnagar subdivision in greenlands division and the work will be executed by the construction wing of banjara hills circle
Read moreBifurcation of 11kv lucid feeder originally emanating from 33/11kv command control room substation by erection of 1 no new 11kv feeder from the 33/11kv road no.2 ss by utilization of 11kv indoor breaker in the 33/11kv road no.2 ss which includes laying of 0.6 km of 11kv 3x300 sq.mm of xlpe ug cable(double run) in banjara hills section of banjara hills subdivision of banjarahills division and the work executed by the construction wing of banjara hills division of banjara hills circle
Bifurcation of 11kv lucid feeder originally emanating from 33/11kv command control room substation by erection of 1 no new 11kv feeder from the 33/11kv road no.2 ss by utilization of 11kv indoor breaker in the 33/11kv road no.2 ss which includes laying of 0.6 km of 11kv 3x300 sq.mm of xlpe ug cable(double run) in banjara hills section of banjara hills subdivision of banjarahills division and the work executed by the construction wing of banjara hills division of banjara hills circle
Read moreBifurcation of the existing 11kv fathenagar feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv breaker and laying of 1.4 km 11kv 3x300 sq.mm xlpe ug cable (single run) in sanathnagar section of sanathnagar sub-division in greenlands division and the work will be executed by the construction wing of banjara hills circle under t and d improvements works under sc reserved category
Bifurcation of the existing 11kv fathenagar feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv breaker and laying of 1.4 km 11kv 3x300 sq.mm xlpe ug cable (single run) in sanathnagar section of sanathnagar sub-division in greenlands division and the work will be executed by the construction wing of banjara hills circle under t and d improvements works under sc reserved category
Read moreLaying of 33kv 400 sq mm 3 core xlpe al armoured cable along with providing and installation of 33kv grade outdoor termination kit and straight through jointing kit for power supply through cable of main incomer fdr 1 and 2 beneath railway track
Laying of 33kv, 400 sq. mm 3 core xlpe al armoured cable along with providing and installation of 33kv grade outdoor termination kit and straight through jointing kit for power supply through cable of main incomer fdr 1 and 2 beneath railway track
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreof your Industry type