Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Out Sourcing Of Conveyor Rubber Lagging, Vulcanization Etc. For Pit Head Chp Of Kistaram Oc, Kothagudem Area For A Period Of One Year
|
| Description |
Out Sourcing Of Conveyor Rubber Lagging, Vulcanization Etc. For Pit Head Chp Of Kistaram Oc, Kothagudem Area For A Period Of One Year
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 556038 |
|
Reference Number |
EKG24O0111 |
| Tender Fee | 354 |
| EMD | 0 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | November 09, 2024 22:30 |
| End Date |
Expired
02/12/2024
Expired 680 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Echp-ii-providing rubber lagging of various pulleys in conveyor belts
Echp-ii-providing rubber lagging of various pulleys in conveyor belts
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreOutsourcing of conveyor rubber lagging etc. for pit head chp of kistaram oc, kothagudem area for a period of one year.
Outsourcing of conveyor rubber lagging etc. for pit head chp of kistaram oc, kothagudem area for a period of one year.
Read moreOut sourcing of painting and other works at kistaram ocp, kothagudem area
Out sourcing of painting and other works at kistaram ocp, kothagudem area
Read moreCustom bid for services - m18142 arc cold vulcanization of conveyor belts rubber lagging lining job
Read more
Carrying out cold vulcanization joints, rubber lagging and cold patches works on belt conveyor working at jk5oc chp,yellandu area for a period of one (1) year -reg.
Carrying out cold vulcanization joints, rubber lagging and cold patches works on belt conveyor working at jk5oc chp,yellandu area for a period of one (1) year.
Read moreRubber lagging conveyor belt
Outsourcing contract for rubber lagging, cold patch repairs and epfr belt jointing for 1200mm conveyor belts working at ktkoc-ii, bhupalpalli area for a period of two years
Read moreof your Industry type