Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Reconstruction Of Minor Bridge At Km.1/4 Of Velugodu Gadivemula Kalva Veldurty Krishnagiri P.Kotakonda Eduladevarabanda Road In Nandyal District (2nd Call)
|
Description |
Reconstruction Of Minor Bridge At Km.1/4 Of Velugodu Gadivemula Kalva Veldurty Krishnagiri P.Kotakonda Eduladevarabanda Road In Nandyal District (2nd Call)
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5325 |
EMD | 1.51 Lakh |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 22:00 |
End Date |
17/07/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Construction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Read moreConstruction of major bridge, minor bridge service roads,rcc drain, culverts and bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in the state of maharashtra on epc mode
Construction of major bridge, minor bridge service roads,rcc drain, culverts and
 bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in
 the state of maharashtra on epc mode
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreof your Industry type