Tender Details

Particulars Details
Title
Pkg7 Bhiwandi Portion: Ap2500 To Ap2630 Deployment Of Gangs For Tower Erection And Stringing Works Under Facilitation Mode To Expedite The Construction Of 765 K V Navsari Padghe Dc Transmission Line In Wr 1 Portion
Description
Pkg7 Bhiwandi Portion: Ap2500 To Ap2630 Deployment Of Gangs For Tower Erection And Stringing Works Under Facilitation Mode To Expedite The Construction Of 765 K V Navsari Padghe Dc Transmission Line In Wr 1 Portion
Organisation Power Grid Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 26255
Reference
Number
WR1/NT/W-TW/DOM/F01/25/10900
Tender Fee 0
EMD 8.72 Lakh
Tender Value
Place Bhiwandi Portion
Link
View Original Tender Notice

https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=4e3fcbe3-92a5-42c8-b838-70587dd4a4f8

Start Date August 22, 2025 17:36
End Date
Expired 29/08/2025

Expired 295 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Read more
Repair and maintenance to md accn in lancer line-i, lancer line -ii, mes colony and jsi enclave under the area of age b/r-i of ge (army) no 1 jodhpur

Repair and maintenance to md accn in lancer line-i, lancer line -ii, mes colony and jsi enclave under the area of&#x0d age b/r-i of ge (army) no 1 jodhpur&#x0d

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027. sl-03

Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027.

Read more
Ca no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)

Ca no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)

Read more
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)

Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)

Read more
Kg-6: bhiwandi portion ap2380 to ap249b0 deployment of gangs for tower erection and stringing works under facilitation mode to expedite the construction of 765 kv navsari padghe d/c transmission line in (wr-1 portion)

Pkg-6: bhiwandi portion ap2380 to ap249b0 deployment of gangs for tower erection and stringing works under facilitation mode to expedite the construction of 765 kv navsari padghe d/c transmission line in (wr-1 portion)

Read more
Foundation, tower erection, stringing, de-stringing etc for permanent restoration of 400 kv korba-bhilai ckt-1 line under bilaspur tlm

Foundation, tower erection, stringing, de-stringing etc for permanent restoration of 400 kv korba-bhilai ckt-1 line under bilaspur tlm

Read more
66kv dc/dc tower line from 220kv alawalpur to 66 kv adampur s/s

Laying of tower foundations, erection of towers and stringing and sagging of conductor with earth wire for 66kv dc on dc tower line from 220kv alawalpur to 66 kv adampur ss old hrp sc line replacement work

Read more
66kv dc/dc tower line from 220kv alawalpur to 66 kv adampur s/s

Laying of tower foundations, erection of towers and stringing and sagging of conductor with earth wire for 66kv dc/dc tower line from 220kv alawalpur to 66 kv adampur s/s. old hrp sc line replacement work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise