Supply, Erection And Testing Of Chilled Water Piping From Central Water Chilling Plant To Core Sub Assembly Plant At Frfcf Site, Kalpakkam
Description
Supply, Erection And Testing Of Chilled Water Piping From Central Water Chilling Plant To Core Sub Assembly Plant At Frfcf Site, Kalpakkam
Organisation Bhabha Atomic Research Centre | Bhabha Atomic Research Centre Kalpakkam
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD 16.25 Lakh
Tender Value 8.13 Crore
Place
Link Login to view
Start Date September 02, 2026 22:30
End Date
Closing soon 14/10/2026

1 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection, testing, commissioning and training of 50tr chilled water package unit as per annexure 1

Erection, testing, commissioning and training of 50tr chilled water package unit as per annexure 1

Read more
Supply, fabrication and erection of ss304l pipe-in-pipe piping and associated structural works for hlw trench from wtf to wmp of frfcf project

Supply, fabrication and erection of ss304l pipe-in-pipe piping and associated structural works for hlw trench from wtf to wmp of frfcf project

Read more
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site

Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site

Read more
Supply, erection, installation, testing and commissioning of 33kv overhead line and 33 to 0.415kv distribution system at mbrapp site for field hostel.

Supply, erection, installation, testing and commissioning of 33kv overhead line and 33 to 0.415kv distribution system at mbrapp site for field hostel.

Read more
Supply, erection, commissioning & testing of 11 tr air cooled package air conditioner,supply & installation of duct external puff thermal insulation for the existing chilled air supply,supply installation & testing of new duct with puff thermal insulation suitable for 11 tr air cooled

Supply, erection, commissioning & testing of 11 tr air cooled package air conditioner,supply & installation of duct external puff thermal insulation for the existing chilled air supply,supply installation & testing of new duct with puff thermal insulation suitable for 11 tr air cooled

Read more
Job contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp

Job contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp

Read more
Design, manufacture, factory testing, supply, erection, testing at site and commissioning of 1 each 110/22kv,25mva pr. trs. with allied equipments and allied bay extn. works including civil works at kmpt 110/22kv ss and at mplm 110/22-11kv sss, edp.

Design, manufacture, factory testing, supply, erection, testing at site and commissioning of 1 each 110/22kv,25mva pr. trs. with allied equipments and allied bay extn. works including civil works at kmpt 110/22kv ss and at mplm 110/22-11kv sss, edp.

Read more
Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Read more
Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismant

Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismantling of existing unit, erection, testing and commissioning of new generator/motor unit at srisailam left bank hydro electric station (slbhes, reversible pumped storage plant), srisailam dam west, nagarkurnool dist., telangana, india.

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise