Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Bids: Construction Project On Nh12/Nh46 🛣️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Is Seeking Bids From Experienced Contractors For The Construction Of A Service Road, Rcc Drain, And Improvement Of Median Openings And Junctions On The Bpl Biaora Section Of Nh12 New Nh46. The Project Spans From Design Km 324.00 To Km 421.325 In Madhya Pradesh. 📅 Bid Submission Deadline: July 31, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 920,000 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Project Specifications And Timelines. Keywords: Construction, Nhai, Nh12/Nh46, Service Road, Rcc Drain, Median Opening, Junctions Improvement, Madhya Pradesh, Government Tender, Bid Submission, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Construction Of Balance Service Road At Pilukhedi And Biaora End Alongwith Rcc Drain And Development Of Median Opening And Junctions Improvement On Bpl Biaora Section Nh12 New Nh46 From Design Km 324.00 To Km 421.325 In The State Of Mp
|
Description |
Construction Of Balance Service Road At Pilukhedi And Biaora End Alongwith Rcc Drain And Development Of Median Opening And Junctions Improvement On Bpl Biaora Section Nh12 New Nh46 From Design Km 324.00 To Km 421.325 In The State Of Mp
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_198584_1 |
Reference Number |
NHAI/RO-BPL/RS-BPL Biaora/EPC/2024 |
Tender Fee | 10000 |
EMD | 9.2 Lakh |
Tender Value | |
Place | NHAI RO Bhopal |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=217228 |
Start Date | June 18, 2024 16:40 |
End Date |
07/08/2024 ( Expired 333 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of rcc box culvert and minor bridge at km 98.600 and km 106.650 design km km 580.300 and km 65.850 on nh 64 as bareja nadiyad city anand amberavpura kankapura section in the sog
Construction of rcc box culvert and minor bridge at km 98.600 and km 106.650 design km km 580.300
 and km 65.850 on nh 64 as bareja nadiyad city anand amberavpura kankapura section in the sog
Read moreConstruction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for newli fee plaza at km 54.100 for the use of biaora to maksudangarh section from design km 3.150 to km 42.510 and maksudangarh to sironj section in madhya pradesh
Engagement of user fee collection agency on the basis of cb through e-tender for newli fee plaza at km 54.100 for the use of biaora to maksudangarh section from design km 3.150 to km 42.510 and maksudangarh to sironj section in madhya pradesh
Read moreof your Industry type