Tender Details

Particulars Details
Title
Retrofitment Of Twin Pipe Air Brake System In B.G. Wagons At Pratapnagar Workshop, Western Railway.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79373460
Reference
Number
M137_MECH_PRTN_TEND_25_01
Tender Fee 0
EMD 2.07 Lakh
Tender Value
Place Mumbai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79373460/viewNitPdf_4824784.pdf
Start Date January 06, 2025 21:31
End Date

06/02/2025 ( Expired 151 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam

Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam

Read more
Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)

Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)

Read more
Sitc of area gamma monitor, portable monitoring system, alpha-beta counting system, teletector and neutron monitor at project site in nd(v)

Sitc of area gamma monitor, portable monitoring system, alpha-beta counting system, teletector and neutron monitor at project site in nd(v)

Read more
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room

Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room

Read more
Construction of rob at railway crossing on roteda to sogariya road in district kota

Construction of rob at railway crossing on roteda to sogariya road in district kota

Read more
Providing air conditioning system at 220kv rampachodaaram ss

Providing of air conditioning system in control room towards implementation of protection audit recommendations at 220kv substation rampachodavaram

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise