Tender Details

Particulars Details
Title
Asansol Division: Improvement Of Street Light Of Various Colony In Asn Divn.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79847613
Reference
Number
EL-83-24
Tender Fee 0
EMD 2.43 Lakh
Tender Value
Place Kolkata
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79847613/viewNitPdf_4851044.pdf
Start Date February 05, 2025 21:46
End Date

27/02/2025 ( Expired 103 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
One time improvement from km 26.800 to km 28.000 of nh-104 (new nh-227) ( total length 1.300 km) for the fy 2023_24 in state of bihar.

One time improvement from km 26.800 to km 28.000 of nh-104 (new nh-227) ( total length 1.300 km) for the fy 2023_24 in state of bihar.

Read more
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise