Tender Details
Particulars | Details |
---|---|
Title |
Shifting And Height Raising Of 132 Kv S/C Bilara Jhalamand Line At Loc. 208 209,187 188,173 174 As Departmental Work.
|
Description |
Shifting And Height Raising Of 132 Kv S/C Bilara Jhalamand Line At Loc. 208 209,187 188,173 174 As Departmental Work.
|
Organisation | RRVPN - CMD | State Govt. and UT |
Tender Id | 2025_RRVPN_459457_1 |
Reference Number |
2610002412/16.4.25 |
Tender Fee | 1770 |
EMD | 38950 |
Tender Value | |
Place | 132 KV S/C Bilara Jhalamand Line |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=824674 |
Start Date | April 17, 2025 16:30 |
End Date |
12/05/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreJp/b862-102-pl-t-4100/1014 automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreGravelling work at 132 kv switch yard of chandil substation and 33 kv s-y of jamshedpur substation under gomd-iii, dvc, jamshedpur
Gravelling work at 132 kv switch yard of chandil substation and 33 kv s-y of jamshedpur substation under gomd-iii, dvc, jamshedpur
Read moreSpl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Read moreConstruction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreof your Industry type