🏭 Tender Announcement For Ttps Operation Circle Mpm I Unit I Overhaul 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Overhauling Of Worn Out Fuel Inlet Elbows, Special Bends, Coal Pipes, And Orifices In The Boiler Corner 1 & 2 During The Forthcoming Overhaul Of Mpm I Unit I At Ttps. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 4800 Has Been Set, With No Emd Required. Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Such Overhauling Tasks. Detailed Bids Should Include A Comprehensive Work Plan, Pricing, And Timelines For Project Completion. Keywords: Tneb Limited, Ttps Operation Circle, Mpm I Unit I, Overhaul, Fuel Inlet Elbows, Special Bends, Coal Pipes, Orifices, Boiler, State Government Undertaking, Tender, Bid Submission
Particulars Details
Title
Ttps Operation Circle Mpm I Unit I Overhauling Of Worn Out Fuel Inlet Elbows Special Bends Coal Pipes And Orifices In Boiler Corner 1 2 During The Forthcoming Overhaul
Description
Ttps Operation Circle Mpm I Unit I Overhauling Of Worn Out Fuel Inlet Elbows Special Bends Coal Pipes And Orifices In Boiler Corner 1 2 During The Forthcoming Overhaul
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_460020_1
Reference
Number
CE/SE/O/TTPS/Spec.No.196/24-25
Tender Fee 0
EMD 4800
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546837
Start Date July 04, 2024 22:30
End Date

18/07/2024 ( Expired 303 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps operation circle mpm ii unit iv overhauling of seal air fans during forthcoming annual overhaul

Ttps operation circle mpm ii unit iv overhauling of seal air fans during forthcoming annual overhaul

Read more
Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph

Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph

Read more
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26

Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26

Read more
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Read more
Ttps operation circle mpm ii ac plant renewing of worn out air intake louvers with weld mesh and supporting frames at unit iii fan house

Ttps operation circle mpm ii ac plant renewing of worn out air intake louvers with weld mesh and supporting frames at unit iii fan house

Read more
Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26

Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26

Read more
Overhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw

Overhauling of flue gas damper assembly of aph &amp#x0d inlet/primary/secondary air, servicing of esp inlet &amp#x0d gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the &amp#x0d capital overhauling of unit6 of 2x250mw

Read more
Ttps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul

Ttps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul

Read more
Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026

Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026

Read more
Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026

Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026