Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Drilling Of Defunct Dtw Including Reconnection To The Existing Line Repair And Maintenance Of Pump House And Pipe Line Along With Supply Of Materials At 151 T Nrishinghakhola Of Bagdah Block Under Barasat Ai Divn Under Core Sector 2024 25.
|
| Description |
Re Drilling Of Defunct Dtw Including Reconnection To The Existing Line Repair And Maintenance Of Pump House And Pipe Line Along With Supply Of Materials At 151 T Nrishinghakhola Of Bagdah Block Under Barasat Ai Divn Under Core Sector 2024 25.
|
| Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
| Tender Id | 2024_WRDD_737722_5 |
|
Reference Number |
WRIDD/EEAI/BST/eNIT4/24-25 |
| Tender Fee | 0 |
| EMD | 38832 |
| Tender Value | - |
| Place | BARASAT |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1629582 |
| Start Date | August 22, 2024 23:30 |
| End Date |
Expired
09/09/2024
Expired 763 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Redrilling of defunct own and operated dtw and reconnection of existing line repair maintenance or construction of pump house repairing of pipe line along with supply of necessary materials at diff blocks under the barasat ai divn core sector 23 24
Drilling installation and development of hdtw size 355.6mm x 219mm od and other necessary works at 37t sabdalpur dtw under habra -ii block under barasat ai division under core sector 23 24 programme
Read moreRe-drilling against defunct tubewell at tildanga dtw (bn- 99)
Re-drilling against defunct tubewell at tildanga dtw (bn- 99 ) under khandaghosh development block within burdwan (ai) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme.
Read moreRe-drilling against defunct tubewell at amarpur dtw (bn-132 )
Re-drilling against tubewell at amarpur dtw (bn- 132 ) under aushgram-ii development block within burdwan (ai) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme
Read moreRe-drilling of defunct own and operated 3 nos. dtw
Re-drilling of defunct own and operated dtw to the existing line repair and maintenance of pump house and pipe line along with supply of necessary materials at different blocks under the jurisdiction of mid(a-i) divn, under core sector programme.
Read moreRe drilling of defunct own and operated 3 nos dtw including repair maintenance or construction of pumphouse repairing of pipe line along with supply of necessary materials at different blocks under barasat ai divn under core sector 2024 25 programme
Re-drilling of 1 no. mdtw of size 250mmx150mm n.b with m.s. erw pipes including supply of all required materials at 139/t panpur-i dtw center,mouza-panpur,jl.no.05,plotno.1197 under barrackpore-i block under barasat ai divn under core-sector 2024-25
Read moreRenovation of water transmission arrangement including supply of materials at 133t maricha ii dtw at amdanga block under barasat ai sub divn under barasat ai divn under core sector 23 24 programme
Renovation of water transmission arrangement including supply of materials at 133t maricha ii dtw at amdanga block under barasat ai sub divn under barasat ai divn under core sector 23 24 programme
Read moreRenovation of water transmission arrangement at uttar jeala dtw 233 t under bagdah block under barasat a i division under core sector 2023 24 programme
Renovation of water transmission arrangement at uttar jeala dtw 233 t under bagdah block under barasat a i division under core sector 2023 24 programme
Read moreReconnection of tubewell assembly with surgetank through delivery pipe repairing of existing pumphouse pipeline and electrical wiring of pumphouse at redrilled dtw namely 18t guma dtw under habraii block under barasat ai div under core sector 2023 24
Reconnection of tubewell assembly with surgetank through delivery pipe repairing of existing pumphouse pipeline and electrical wiring of pumphouse at redrilled dtw namely 18t guma dtw under habraii block under barasat ai div under core sector 2023 24
Read moreRe drilling installation and development of 01 no hdtw of 350mmx200mm nb in place of defunct 01 no dtw at 131t uttar durlavpur dtw at mouza uttar durlavpur gp adhata jl no 13block amdanga under barasat ai division under core sectorprogram fy 25 26
Re drilling installation and development of 01 no hdtw of 350mmx200mm nb in place of defunct 01 no dtw at 131t uttar durlavpur dtw at mouza uttar durlavpur gp adhata jl no 13block amdanga under barasat ai division under core sectorprogram fy 25 26
Read moreRedrilling of defunct own n operated tube wells including reconnection of existing line repair maintenance of pump house repairing of pipeline along with supply of necessary erw pipes at different blocks under barasat ai divn coresector 2023 24prog
Re-drilling, installation, development of hdtw of size 250mmx150mm nb., reconnection of tw assembly and other necessary works at 8t khasbalanda mdtw, jl.no.63, plot no.73 under haroa block under barasat (ai) division under core-sector 2023-24 prog.
Read moreof your Industry type