Tender Details

Particulars Details
Title
Improvements To Road From S.H.178 To New Karanje Road. V.R.No.60 Km. 0/00 To 1/00, Taluka Radhanagari, Dist. Kolhapur
Description
Improvements To Road From S.H.178 To New Karanje Road. V.R.No.60 Km. 0/00 To 1/00, Taluka Radhanagari, Dist. Kolhapur
Organisation Government of Maharashtra
Tender Id 2023_PWDRP_917799_7
Reference
Number
E Notice No.09 for 2023-2024
Tender Fee 600
EMD 32000
Tender Value
Place Executive Engineer, P.W.(South) Division, Kolhapur
Link https://mahatenders.gov.in
Start Date June 21, 2023 17:30
End Date

28/06/2023 ( Expired 730 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period

Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period

Read more
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Construction of atal path widening and cc road work from sh-62 to bijapur road in km 0/0 to 1/250

Construction of atal path widening and cc road work from sh-62 to bijapur road in km 0/0 to 1/250

Read more
Widening and strengthening sunel to karodiya, unhel to osav to pirawa via odiya kheri to kotri to govindpura, karawan via dhaturiya bani. singhpura up to mp border from km. 60/150 to 70/500 including 1 no submersible bridge (mdr-377).

Widening and strengthening sunel to karodiya, unhel to osav to pirawa via odiya kheri to kotri to govindpura, karawan via dhaturiya bani. singhpura up to mp border from km. 60/150 to 70/500 including 1 no submersible bridge (mdr-377).

Read more
Improvement of khaliapali-lambasari- dapala- baragocha road from 0/000 km to 15/200 km in the district of boudh under state plan

Improvement of khaliapali-lambasari- dapala- baragocha road from 0/000 km to 15/200 km in the district of boudh under state plan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise