Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carbon Manganese Electrodes, Size: 3.15mm, Length: 350 Mtrs
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2025/B/6151611 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 22, 2025 15:06 |
| End Date |
Expired
13/05/2025
Expired 518 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
12 mm dia x 2 to 3 mtrs length,20 mm dia x 2 to 3 mtrs length,25 mm dia x 2 to 3 mtrs length,32 mm dia x 2 to 3 mtrs length,40 mm dia x 2 to 3 mtrs length,50 mm dia x 2 to 3 mtrs length,65 mm dia x 2 to 3 mtrs length,80 mm dia x 1 to 2 mtrs length,100 mm dia x 1 to 2 mtrs length,120 mm dia x 1 to 2 mtrs length,150 mm dia x 1 to 2 mtrs length,200 mm dia x 1 to 2 mtrs length
12 mm dia x 2 to 3 mtrs length,20 mm dia x 2 to 3 mtrs length,25 mm dia x 2 to 3 mtrs length,32 mm dia x 2 to 3 mtrs length,40 mm dia x 2 to 3 mtrs length,50 mm dia x 2 to 3 mtrs length,65 mm dia x 2 to 3 mtrs length,80 mm dia x 1 to 2 mtrs length,100 mm dia x 1 to 2 mtrs length,120 mm dia x 1 to 2 mtrs length,150 mm dia x 1 to 2 mtrs length,200 mm dia x 1 to 2 mtrs length
Read moreComplete 28v dc output cable assy (15 mtrs length) with nato 03 pin adapter and protective sleeve
Complete 28v dc output cable assy (15 mtrs length) with nato 03 pin adapter and protective sleeve
Read moreConstruction of a boundary wall -length 350 m- at the dang bungala in village khanna development block kabrai
Construction of a boundary wall -length 350 m- at the dang bungala in village khanna development block kabrai
Read moreUpgradation of internal link road in domkhar (by way of laying bt, length 1500 mtrs ). under district plan
Upgradation of internal link road in domkhar (by way of laying bt, length 1500 mtrs ). under district plan
Read moreCarbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 1 inch,carbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 1.5-inch,carbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 2-inch
Carbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 1 inch,carbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 1.5-inch,carbon steel seamless pipe in random length of 5-7 meter conf. to astm a 106 gr. b size: 2-inch
Read moreReshi baba storage tank reactivation by way of providing of rcc wall and replacing of soil for arresting of leakages (length 80 mtrs).
Reshi baba storage tank reactivation by way of providing of rcc wall and replacing of soil for arresting of leakages (length 80 mtrs).
Read moreProcurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreStrengthening slope stabilization and toe protection of vulnerable and weak embankment of river jhelum at rd 91 km ds for a length of 50 mtrs
Strengthening slope stabilization and toe protection of vulnerable and weak embankment of river jhelum at rd 91 km ds for a length of 50 mtrs
Read moreSitc of new booster pump 02 no along with motors and valves and accessories and gi pipeline from ventilation tunnel to collection gallery approximate length 400 mtrs at bhep-i
Sitc of new booster pump 02 no along with motors and valves and accessories and gi pipeline from ventilation tunnel to collection gallery approximate length 400 mtrs at bhep-i
Read moreSitc of new booster pump 02 no along with motors and valves and accessories and gi pipeline from ventilation tunnel to collection gallery approximate length 400 mtrs at bhep-ii
Sitc of new booster pump 02 no along with motors and valves and accessories and gi pipeline from ventilation tunnel to collection gallery approximate length 400 mtrs at bhep-ii
Read moreof your Industry type