Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bhattu Samloh Nallah Bridge Rd 104.300 (Sw P/L Jacketing To Abutment Ai , Railing) (Ii) Arla Nallah Bridge Rd 106.630 (Sw P/L Jacketing To Abutment Ai, Railing) (Iii) Paprola Pun Khad Bridge Rd 126.030 (Sw P/L Protection Wall , Railing)
|
| Description |
Bhattu Samloh Nallah Bridge Rd 104.300 (Sw P/L Jacketing To Abutment Ai , Railing) (Ii) Arla Nallah Bridge Rd 106.630 (Sw P/L Jacketing To Abutment Ai, Railing) (Iii) Paprola Pun Khad Bridge Rd 126.030 (Sw P/L Protection Wall , Railing)
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_104958_1 |
|
Reference Number |
EE PLP NIT No. 701-750 dated 02.05.2025 |
| Tender Fee | 2000 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | Palampur |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=153826 |
| Start Date | May 08, 2025 15:30 |
| End Date |
Expired
14/05/2025
Expired 519 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
C.o 61.00 meter span bailey bridge on baspa river on shong palingche road at rd 2.360 in distt. kinnaur hp. sh. c.o balance work of palingche side abutment i.c toe wall of the bridge abutment.
C.o 61.00 meter span bailey bridge on baspa river on shong palingche road at rd 2.360 in distt. kinnaur hp. sh. c.o balance work of palingche side abutment i.c toe wall of the bridge abutment.
Read moreF.p work on aripath nallah at rd km 29 600 d.s ashajipora bridge.
F.p work on aripath nallah at rd km 29 600 d.s ashajipora bridge.
Read moreConstruction of h.l. bridge over local nallah on rd road to sarsiamal via patamal
Construction of h.l. bridge over local nallah on rd road to sarsiamal via patamal
Read moreConstruction of h.l. bridge over sunari nallah at 1st km on rd road to hariharpur road
Construction of h.l. bridge over sunari nallah at 1st km on rd road to hariharpur road
Read moreConstruction of bridge over kuarian nallah on pingua-laulai rd road to chhtatentuli via nehengera road
Construction of bridge over kuarian nallah on pingua-laulai rd road to chhtatentuli via nehengera road
Read moreConstruction of h.l bridge over local nallah on rd road to dengaguda road in the district of nabarangpur under sby for the year 2024-25.
Construction of h.l bridge over local nallah on rd road to dengaguda road in the district of nabarangpur under sby for the year 2024-25.
Read moreRepair to bridge over hada nallah on katakapada to chuda road such as pothole repair with busg and pmc with sc at approaches, fixing of railing and guard post for the year 2026-27
Repair to bridge over hada nallah on katakapada to chuda road such as pothole repair with busg and pmc with sc at approaches, fixing of railing and guard post for the year 2026-27
Read moreLaying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.
Laying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.
Read moreA.r and m.o suspension bridge over satluj river on chaura rupi up to chotta kamba road at rd 5.050 in distt. kinnaur sh. replacement repair of decking plate railing and side guard
A.r and m.o suspension bridge over satluj river on chaura rupi up to chotta kamba road at rd 5.050 in distt. kinnaur sh. replacement repair of decking plate railing and side guard
Read moreRepair to bridge over dahuka nallah at 0.500km on rd road to raghunathpur road such as scarifying bt surface with provision of gr-iii metalling at patches with pmc and sc at both side approaches for the year 2026-27
Repair to bridge over dahuka nallah at 0.500km on rd road to raghunathpur road such as scarifying bt surface with provision of gr-iii metalling at patches with pmc and sc at both side approaches for the year 2026-27
Read moreof your Industry type