Tender Details

Particulars Details
Title
Renovation / Up Gradation Of Drill Shed Of 138 Bn (Now 71 Bn ) Bsf Under Shq Bsf Amritsar(composite Work)
Description
Renovation / Up Gradation Of Drill Shed Of 138 Bn (Now 71 Bn ) Bsf Under Shq Bsf Amritsar(composite Work)
Organisation DG,BSF,MHA | Central Govt. Ministry/Department
Tender Id 2024_BSF_817164_1
Reference
Number
135/FTR-PB/2024-25
Tender Fee 0
EMD 30854
Tender Value
Place BHIKHIWIND 71 BN BSF
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=858768
Start Date July 19, 2024 18:40
End Date

27/07/2024 ( Expired 319 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Const. of 220kv, 1x160 mvaand132/33 kv, 1x50 mva gss at karnu (distt. nagur) with associated bay work on trunkey under bn-9018002507

Const. of 220kv, 1x160 mvaand132/33 kv, 1x50 mva gss at karnu (distt. nagur) with associated bay work on trunkey under bn-9018002507

Read more
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Read more
Construction of double gate and wall at deepak padda dwar of 281 med regt and em work at lpg storage shed under ge (west) pathankot

Construction of double gate and wall at deepak padda dwar of 281 med regt and em work at lpg storage shed under ge (west) pathankot

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
05/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 03/06/2025(sl no-04)

Repair and up-gradation work of narshingh dutta road under howrah municipal corporation area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise