Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Soft Partition, Experimental Concrete Tables With Granite Top I/C Misc. Repairing And Painting Of 202 New Core Lab, At Iit Kanpur
|
Description |
Construction Of Soft Partition, Experimental Concrete Tables With Granite Top I/C Misc. Repairing And Painting Of 202 New Core Lab, At Iit Kanpur
|
Organisation | Indian Institute of Technology Kanpur | Central Govt. Ministry/Department |
Tender Id | 2024_IITK_838011_1 |
Reference Number |
15/Civil/D3/2024-25 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | IIT Kanpur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=885574 |
Start Date | January 02, 2025 23:30 |
End Date |
09/01/2025 ( Expired 178 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreRepair/maint of ht cable, power transformer and distribution transformer and other connected misc work at cantt area under ge (i) kanpur
Repair/maint of ht cable, power transformer and
 distribution transformer and other connected misc work
 at cantt area under ge (i) kanpur
Read moreConstruction of toilet painting boundary wall,and repairing of old classrooms shed stage and hall at girls higher seconary school nehru nagar w/29 z/08
Construction of toilet painting boundary wall,and repairing of old classrooms shed stage and hall at girls higher seconary school nehru nagar w/29 z/08
Read moreRemoving and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.
Removing and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read moreConstruction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Construction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Read more06/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 25/06/2025
Construction of a new bailey bridge both ways (to and fro journey) at lake town, vip road and salt lake connector near dakshindari. (first call).&#x0d sh -for foundation and sub-structure work.&#x0d
Read moreConstruction of pqc road along with drain and concrete pavement at kulda ocp of basundhara area
Construction of pqc road along with drain and concrete pavement at kulda ocp of basundhara area
Read moreof your Industry type