Tender Details
Particulars | Details |
---|---|
Title |
Chilled Water Cooling Coil For Ahu Installed In Electrical Sub Station Ref Iii
|
Description |
|
Organisation | CHENNAI PETROLEUM Corporation Limited | Ministry of Petroleum and Natural Gas |
Tender Id | GEM/2023/B/3953505 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | September 13, 2023 20:32 |
End Date |
28/09/2023 ( Expired 596 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | ANIKA STEEL | Make : JUGAL UDYOG Model : Chilled water cooling coil for AHU installed Title : Chilled water cooling coil for AHU installed | 28-10-2023 12:05:02 | MII MSE | Qualified |
2 | SALLERIA ENGINEERS | Make : NA Model : AHU COOLING COIL Title : AHU COOLING COIL | 16-10-2023 12:34:55 | MII MSE | Qualified |
3 | TOOT MNE TECH PRIVATE LIMITED | Make : TOOT Model : THF / TVF / TCS Title : AIR HANDLING UNIT | 09-10-2023 12:20:21 | MII MSE | Qualified |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreIndependent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Read moreProviding of vibration dampers and arcing horns for 132 kv koilsagar-khanapur line from loc.no.79 to 146 in jurala lines sub division in mahabubnagar circle.
Providing of vibration dampers and arcing horns for 132 kv koilsagar-khanapur line from loc.no.79 to 146 in jurala lines sub division in mahabubnagar circle
Read moreInviting rates for water supply material as given in the list for the financial year 2025-26
Inviting rates for water supply material as given in the list for the financial year 2025-26
Read moreAutomation and upgradation of existing water supply system including outsourcing for monitoring, management and operation of the same at binnaguri mil station under ge (s) binnaguri
Automation and upgradation of existing water supply system including outsourcing for monitoring, management and operation of the same at binnaguri mil station under ge (s) binnaguri
Read moreProcurement for temperature elements (rtd, thermocouple) installed in air and flue gas path and pulverisers in boiler area at 2x660 mw, sstpp, mppgcl, khandwa/etni-ii
Procurement for temperature elements (rtd, thermocouple) installed in air and flue gas path and pulverisers in boiler area at 2x660 mw, sstpp, mppgcl, khandwa
Read moreMtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Read moreSupply, testing and commissioning of 12v 65 ah smf batteries for ups system in rihand hydro power station, pipri
Supply, testing and commissioning of 12v 65 ah smf batteries for ups system in rihand hydro power station, pipri, distt. sonebhadra
Read moreof your Industry type