Tender Details
Particulars | Details |
---|---|
Title |
Repairing/Modification Of Bed Plate, Fabrication Of Suction Bend, Delivery Bend, Foot Valve Bend, Installation Of Pump Motor (6000 Gpm) At Borira Mines, Docp Under C.V. Ara For Dewatering Of Mines Water.
|
Description |
Repairing/Modification Of Bed Plate, Fabrication Of Suction Bend, Delivery Bend, Foot Valve Bend, Installation Of Pump Motor (6000 Gpm) At Borira Mines, Docp Under C.V. Ara For Dewatering Of Mines Water.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | DAMAGORIA COLLIERY |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 15:30 |
End Date |
19/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Repairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Read moreRepairing /reconditioning of 04nos nflp starter, 3.3 kv grade for controlling of different pump-motor sets installed in different places in mines under ashok ocp, piparwar area.
Repairing /reconditioning of 04nos nflp starter, 3.3 kv grade for controlling of different pump-motor sets installed in different places in mines under ashok ocp, piparwar area.
Read moreRepairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.
Repairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.
Read moreInstallation of existing pump motor at new pump house, sanction and delivery pipe line, n.rsluice valve, common header for bhooli pump house under jmada dhanbad
Installation of existing pump motor at new pump house, sanction and delivery pipe line, n.rsluice valve, common header for bhooli pump house under jmada dhanbad
Read moreAnnual mtc. of different l.i schemes under dasda and laljuri r.d. block under water resource sub-division kanchanpur north tripura during the year 2025-2026 -sh- repairing of pump motor panel board and suction delivery line
Annual mtc. of different l.i schemes under dasda and laljuri r.d. block under water resource sub-division kanchanpur north tripura during the year 2025-2026 -sh- repairing of pump motor panel board and suction delivery line
Read moreAnnual mtc. of different l.i schemes under pecharthal r.d. block under water resource sub-division kanchanpur north tripura during the year 2025-2026-sh- repairing of pump motor panel board suction delivery line.
Annual mtc. of different l.i schemes under pecharthal r.d. block under water resource sub-division kanchanpur north tripura during the year 2025-2026-sh- repairing of pump motor panel board suction delivery line.
Read moreLaying of pipelines for dewatering of new rohini expansion (0.75 mty) by installing new pump motor sets and to provide water supply to new coal stock and to construct tanker loading point near coal stock by installing new pump motor under rohini
Laying of pipelines for dewatering of new rohini expansion (0.75 mty) by installing new pump motor sets and to provide water supply to new coal stock and to construct tanker loading point near coal stock by installing new pump motor under rohini
Read moreInstallation of 5 nos of 12x150 api 6d motor operated valve (mov) in 12 manifold to replace hand operated valve (hov) at bkpl barauni pump station along with minor modification of piping for making provision of multiproduct pumping thr. bk12 manifold
Installation of 5 nos of 12x150 api 6d motor operated valve (mov) in 12 manifold to replace hand operated valve (hov) at bkpl barauni pump station along with minor modification of piping for making provision of multiproduct pumping thr. bk12 manifold
Read moreDismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area
Dismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area
Read moreSupply, delivery and installation of 125 mm sluice valve and non-return valve for different capacity of p/m at h/l and m/l pump house in wtp site under baranagar-kamarhati joint surface water treatment scheme.
Supply, delivery and installation of 125 mm sluice valve and non-return valve for different capacity of p/m at h/l and m/l pump house in wtp site under baranagar-kamarhati joint surface water treatment scheme.
Read moreof your Industry type