Tender Details

Particulars Details
Title
Design And Construction Of Yuge Yugeen Bharat Underground Station Along With Pd Area Ancillary Building Associated Entry Exits And Connecting Subways Under Phase V A Of Delhi Mrts.
Description
Design And Construction Of Yuge Yugeen Bharat Underground Station Along With Pd Area Ancillary Building Associated Entry Exits And Connecting Subways Under Phase V A Of Delhi Mrts.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2025_DMRC_864634_1
Reference
Number
EC-01
Tender Fee 23600
EMD 1 Crore
Tender Value -
Place DELHI
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=909002

Start Date June 30, 2025 14:30
End Date
Expired 11/07/2025

Expired 459 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Read more
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.

Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.

Read more
Design, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.

Design, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.

Read more
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Read more
Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismant

Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismantling of existing unit, erection, testing and commissioning of new generator/motor unit at srisailam left bank hydro electric station (slbhes, reversible pumped storage plant), srisailam dam west, nagarkurnool dist., telangana, india.

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
design and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna

design and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna

Read more
Appointment of design and project management consultancy for construction of underground subways vestibules connecting two metro line 3 stations science centre and bkc to various developments in vicinity

Appointment of design and project management consultancy for construction of underground subways vestibules connecting two metro line 3 stations science centre and bkc to various developments in vicinity

Read more
Dc of twin tunnel by shield tbm, cc tunnel box, and four underground stations with entry/exits, af, ws, si and drainage works from chainage ch- 7629.531 m to ch- 11700.00 m (dn line) of inderlok-indraprastha corridor of delhi mrts project of phase-iv

Dc of twin tunnel by shield tbm, cc tunnel box, and four underground stations with entry/exits, af, ws, si and drainage works from chainage ch- 7629.531 m to ch- 11700.00 m (dn line) of inderlok-indraprastha corridor of delhi mrts project of phase-iv

Read more
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at mithapur and three underground metro including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at mithapur and three underground metro including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise