Tender Details

Particulars Details
Title
S.R. Of 1x3.00 M Span Rcc Culvert In Km 13 Of Dalmau Jagatpur Salon Marg (Mdr)
Description
S.R. Of 1x3.00 M Span Rcc Culvert In Km 13 Of Dalmau Jagatpur Salon Marg (Mdr)
Organisation Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT
Tender Id 2024_CEUCZ_982219_5
Reference
Number
1913/8 Lekha/2024-25 Dt. 29-11-2024
Tender Fee 860
EMD 2.87 Lakh
Tender Value
Place RAEBARELI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1729037
Start Date December 10, 2024 20:30
End Date

27/12/2024 ( Expired 148 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
O n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.

O n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.

Read more
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Read more
Resurfacing work on leh-chalunka road between km 0.000 to km 52.000 under 54 rcc/ 16 brtf project vijayak in the union territory of ladakh

Resurfacing work on leh-chalunka road between km 0.000 to km 52.000 under 54 rcc/ 16 brtf project vijayak in the union territory of ladakh

Read more
Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise