Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drain With Slab Culvert From Phe Water Supply Counter To Pwd Culvert At Radhanagar Under Volka Barobisha I Gp
|
Description |
Construction Of Drain With Slab Culvert From Phe Water Supply Counter To Pwd Culvert At Radhanagar Under Volka Barobisha I Gp
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 39902 |
Tender Value | |
Place | KUMARGRAM |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 15:30 |
End Date |
23/06/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreSupply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas
Supply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas for the period from 01 oct 2025 to 30 sep 2026
Read moreSupply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala
Supply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala for the period from 01 oct 2025 to 30 sep 2026
Read moreConstruction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreConstruction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Read moreof your Industry type