Tender Details

Particulars Details
Title
Providing Labour For Rabbi Hot Weather 2023 24 For Korambhi,Wadsa, Kondhala, Armori Section From 0.00 To 37.100 Km. Under Juridication Of Wadsa Sub Division Of Itiadoh Project.
Description
Providing Labour For Rabbi Hot Weather 2023 24 For Korambhi,Wadsa, Kondhala, Armori Section From 0.00 To 37.100 Km. Under Juridication Of Wadsa Sub Division Of Itiadoh Project.
Organisation Government of Maharashtra
Tender Id 2024_CEWRN_978176_1
Reference
Number
03/BIID/2023-24
Tender Fee 2360
EMD 17000
Tender Value
Place Exe.Eng.Bagh Itiadoh Irrigation Division Gondia
Link https://mahatenders.gov.in
Start Date January 03, 2024 15:30
End Date

17/01/2024 ( Expired 528 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to

Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to

Read more
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km

Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km

Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km

Read more
Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal equipments and control room for providing power supply to indian agricultural research institute under ghilamara electrical sub-division of north lakhimpur electrical c

Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal &amp#x0d equipments and control room for providing power supply to indian agricultural research &amp#x0d institute under ghilamara electrical sub-division of north lakhimpur ec

Read more
Special repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)

.special repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)

Read more
Construction of rcc bridge in road from bekulguri to banjipathar under sdmf for the year 2023-24.

Construction of rcc bridge in road from bekulguri to banjipathar under sdmf for the year 2023-24.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise