Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Labour For Rabbi Hot Weather 2023 24 For Korambhi,Wadsa, Kondhala, Armori Section From 0.00 To 37.100 Km. Under Juridication Of Wadsa Sub Division Of Itiadoh Project.
|
Description |
Providing Labour For Rabbi Hot Weather 2023 24 For Korambhi,Wadsa, Kondhala, Armori Section From 0.00 To 37.100 Km. Under Juridication Of Wadsa Sub Division Of Itiadoh Project.
|
Organisation | Government of Maharashtra |
Tender Id | 2024_CEWRN_978176_1 |
Reference Number |
03/BIID/2023-24 |
Tender Fee | 2360 |
EMD | 17000 |
Tender Value | |
Place | Exe.Eng.Bagh Itiadoh Irrigation Division Gondia |
Link | https://mahatenders.gov.in |
Start Date | January 03, 2024 15:30 |
End Date |
17/01/2024 ( Expired 528 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km
Consultancy services for authoritys engineer for supervision of construction of road from taliha to tato section of frontier highway nh 913 km 0.00 to 60.25 60.25km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Read moreConstruction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal equipments and control room for providing power supply to indian agricultural research institute under ghilamara electrical sub-division of north lakhimpur electrical c
Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal &#x0d equipments and control room for providing power supply to indian agricultural research &#x0d institute under ghilamara electrical sub-division of north lakhimpur ec
Read moreSpecial repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
.special repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
Read moreConstruction of rcc bridge in road from bekulguri to banjipathar under sdmf for the year 2023-24.
Construction of rcc bridge in road from bekulguri to banjipathar under sdmf for the year 2023-24.
Read moreof your Industry type