Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Trimming Of Tree Branches, Cutting Of Dead Trees, And Removal Of Vegetation And Bushes
|
Description |
Trimming Of Tree Branches, Cutting Of Dead Trees And Removal Of Vegetation And Bushes Along The Mumbai Monorail Alignment And Depot Premises
|
Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
Tender Id | 2025_MMRDA_1157969_1 |
Reference Number |
mMMMOCL-15012(15)/9/2024-CIVIL |
Tender Fee | 1090 |
EMD | 82632 |
Tender Value | |
Place | Mumbai Monorail |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2014184 |
Start Date | March 07, 2025 16:30 |
End Date |
07/04/2025 ( Expired 68 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Removal of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025
Removal of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025
Read moreRemoval and replacement of damaged precast slab of cable trench and drain from different places of 220 kv and 132 kv switch yard, ctps.
Removal and replacement of damaged precast slab of cable trench and drain from different places of 220 kv and 132 kv switch yard, ctps.
Read moreRepair and removal of blockages, cleaning of sewage line, manholes and septic tanks and misc repairs to upkeep the hygienic conditions of the area of vasanth enclave, mi and ml line, prtc, 106 inf bn, hq naval det under ge (north) bangalore
Repair and removal of blockages, cleaning of sewage line, manholes and septic tanks and misc repairs to upkeep the hygienic conditions of the area of vasanth enclave, mi and ml line, prtc, 106 inf bn, hq naval det under ge (north) bangalore
Read moreRepairs to joint filling of b link, ys and certain different locations, elastomeric concrete filling, plinth protection around taxi light and removal of tyre rubber marks of runway etc at af stn utarlai
Repairs to joint filling of b link, ys and certain different locations, elastomeric concrete filling, plinth protection around taxi light and removal of tyre rubber marks of runway etc at af stn utarlai
Read moreClearing of grass, jungles and vegetation in different locations of plant area at btps, dvc,bokaro
Clearing of grass, jungles and vegetation in different locations of plant area at btps, dvc,bokaro.
Read moreAnnual work of cleaning of drain, cleaning and sweeping and road, paved area, open area and removal of gajar grass and disposal of dead animals from power house premises at atps, chachai.
Annual work of cleaning of drain, cleaning and sweeping and road, paved area, open area and removal of gajar grass and disposal of dead animals from power house premises at atps, chachai.
Read moreRemoval of oil from removed bt and shifting to different rss, hiring of crane with skilled men power and vehicle for handling of bm/cb, and supply and installation of cad welding connections of 70sqmm cu cable on track rail of dmrc/tr wing in dmrc.
Removal of oil from removed bt and shifting to different rss, hiring of crane with skilled men power and vehicle for handling of bm/cb, and supply and installation of cad welding connections of 70sqmm cu cable on track rail of dmrc/tr wing in dmrc.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type