Tender Details

Particulars Details
Title
Laying Of 33 Kv, 1x630 Sq.Mm Xlpe Ug Cable From Thirumudivakkam 110 Kv Ss To The Proposed Mangadu Altis 33/11 Kv Ss Reach.Iii (Route Length 2.106 Km )
Description
Laying Of 33 Kv, 1x630 Sq.Mm Xlpe Ug Cable From&Amp#X0d Thirumudivakkam 110 Kv Ss To The Proposed Mangadu Altis&Amp#X0d 33/11 Kv Ss Reach.Iii (Route Length 2.106 Km )
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_504248_1
Reference
Number
CE/D/KPMR/C.912/2024-2025
Tender Fee 0
EMD 86400
Tender Value
Place Kanchipuram Region
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=599893

Start Date November 26, 2024 18:00
End Date
Expired 03/12/2024

Expired 562 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Excavation of cable trenches and laying of 3c x 185 sq.mm. 11 kv grade xlpe ug cable including supply of 160 mm. dia hdpe pipe under serampore division, wbsedcl.

Excavation of cable trenches and laying of 3c x 185 sq.mm. 11 kv grade xlpe ug cable including supply of 160 mm. dia hdpe pipe across the metal road through the micro tunneling work i.r.o. laxmi plaza at 3/32, karl marx sarani, ward no. 16, p.o. more

Read more
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr

Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr

Read more
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Read more
Laying of 33kv, 1x630 sq.mm xlpe ug cable from thirumudivakkam 110kv ss to the proposed mangadu altis 33/11kv ss - reach.i ( route length 3.925 km )

Laying of 33kv, 1x630 sq.mm xlpe ug cable from&amp#x0d thirumudivakkam 110kv ss to the proposed mangadu altis&amp#x0d 33/11kv ss - reach.i ( route length 3.925 km )

Read more
Laying of 33kv, 1x630 sq.mm xlpe ug cable from thirumudivakkam 110kv ss to the proposed mangadu altis 33/11kv ss reach.ii ( route length 3.015 km )

Laying of 33kv, 1x630 sq.mm xlpe ug cable from&amp#x0d thirumudivakkam 110kv ss to the proposed mangadu altis&amp#x0d 33/11kv ss reach.ii ( route length 3.015 km )

Read more
Laying of 33kv, 1x630sq.mm xlpe ug cable from mangadu 110 kvss to the proposed mangadu altis 33/11 kvss ( route length 2.060 km )

Laying of 33kv, 1x630sq.mm xlpe ug cable from mangadu 110&amp#x0d kvss to the proposed mangadu altis 33/11 kvss ( route&amp#x0d length 2.060 km )

Read more
Laying of 33kv, 1x630 sq.mm xlpe ug cable from chinmaya nagar to central ware house, arcot road 33/11kv ss ( route length 2.150 km )

Laying of 33kv, 1x630 sq.mm xlpe ug cable from chinmaya nagar to central ware house, arcot road 33/11kv ss ( route length 2.150 km )

Read more
Laying of 33kv, 1x630sq.mm xlpe ug cable from sriram properties 110kv ss to the proposed perungalathur 33/11kv ss. (route length 1.356km)

Laying of 33kv, 1x630sq.mm xlpe ug cable from sriram&amp#x0d properties 110kv ss to the proposed perungalathur 33/11kv&amp#x0d ss. (route length 1.356km)

Read more
Laying of 33kv, 1x630sq.mm xlpe ug cable from kadapperi 110kv ss feeder from rmk 4pole structure to the proposed perungalathur 33/11kv ss. (route length 0.844km)

Laying of 33kv, 1x630sq.mm xlpe ug cable from kadapperi 110kv ss feeder from rmk 4pole structure to the proposed perungalathur 33/11kv ss. (route length 0.844km)

Read more
Laying of 33kv, 1x630 sq.mm xlpe ug cable from thoraipakkam kannagi nagar existing dp structure to enjambakkam 33/11kv ss as an additional source ( route length 1.512 km )

Laying of 33kv, 1x630 sq.mm xlpe ug cable from thoraipakkam kannagi nagar existing dp structure to enjambakkam 33/11kv ss as an additional source ( route length 1.512 km )

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise