Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Prov. And Laying Of Sewer, Ips, Mps, R.Main At Derabassi.Part A Construction Of Stp 3.00 Mld, 3.50 Mld And 7.50 Mld Including Fstp And All Other Works Contingent There To In Derabassi.. Sbm 2.0 Scheme Part B
|
| Description |
Prov. And Laying Of Sewer, Ips, Mps, R.Main At Derabassi.Part A&Amp#X0d
Construction Of Stp 3.00 Mld, 3.50 Mld And 7.50 Mld Including Fstp And All Other Works Contingent There To In Derabassi.. Sbm 2.0 Scheme Part B
|
| Organisation | Department of Local Government | State Govt. and UT |
| Tender Id | 2024_DLG_126074_1 |
|
Reference Number |
27dated16/08/2024(S.No.1) |
| Tender Fee | 6900 |
| EMD | 53.27 Lakh |
| Tender Value | - |
| Place | Derabassi |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256193 |
| Start Date | August 23, 2024 22:30 |
| End Date |
Expired
23/09/2024
Expired 753 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreOperation and maintenance of 58 mld stp 09 nos ips and 2 nos mps in moradabad city
Operation and maintenance of 58 mld stp 9 nos ips and 2 nos mps in moradabad city near gulabbadi distt moradabad including labour consumables minor and major repair of civil and electrical mechanical works excluding diesel and mobile oil and disposa
Read moreInterception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Interception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Read moreInterception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Interception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Read moreRoutine operation and preventive maintenance work of 120 mld stp, teps, mps goithaha and narokhar ips at varanasi as is where is basis
Routine operation and preventive maintenance work of 120 mld stp, teps, mps goithaha and narokhar ips at varanasi as is where is basis
Read moreProviding laying cutting testig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp inclluding o and m gurdaspur
Providing laying cutting testnig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp including o and m gurdaspur
Read moreDr jobber 1.00 hss m2 1x12x34,dr jobber 1.50 hss m2 1.50x18x40,dr jobber 2.00 hss m2 2x24x49,dr jobber 2.50 hss m2 2.50x30x57,dr jobber 3.00 hss m2 3x33x61,dr jobber 3.20 hss m2 3.20x36x65,dr jobber 3.50 hss m2 3.50x39x70,dr jobber 4.00 hss m2 4x43x75,dr jobber 4.20 hss m2 4.20x43x75,dr jobber 4.50 hss m2 4.50x47x80,dr jobber 5.00 hss m2 5x52x86,dr jobber 5.50 hss m2 5.50x57x93,dr jobber 6.00 hss m2 6x57x93,dr jobber 6.20 hss m2 6.20x63x101,dr jobber 6.50 hss m2 6.50x63x101,dr jobber 7.00 hss m2 7x69x109,dr jobber 7.50 hss m2 7.50x69x109,dr jobber 8.00 hss m2 8x75x117,dr jobber 8.50 hss m2 8.50x75x117,dr jobber 9.00 hss m2 9x81x125,dr jobber 9.50 hss m2 9.50x81x125,dr jobber 10.00 hss m2 10x87x133,dr jobber 10.50 hss m2 10.50x87x133,dr jobber 11.00 hss m2 11x94x142,dr jobber 11.50 hss m2 11.5x94x142,dr jobber 12.00 hss m2 12x101x151,dr jobber 12.50 hss m2 12.5x101x151,dr jobber 13.00 hss m2 13x101x151,dr jobber 13.50 hss m2 13.5x108x160,dr jobber 14.00 hss m2 14x108x160,dr jobber 14.50 hss m2 14.5x114x169,dr
Dr jobber 1.00 hss m2 1x12x34,dr jobber 1.50 hss m2 1.50x18x40,dr jobber 2.00 hss m2 2x24x49,dr jobber 2.50 hss m2 2.50x30x57,dr jobber 3.00 hss m2 3x33x61,dr jobber 3.20 hss m2 3.20x36x65,dr jobber 3.50 hss m2 3.50x39x70,dr jobber 4.00 hss m2 4x43x75,dr jobber 4.20 hss m2 4.20x43x75,dr jobber 4.50 hss m2 4.50x47x80,dr jobber 5.00 hss m2 5x52x86,dr jobber 5.50 hss m2 5.50x57x93,dr jobber 6.00 hss m2 6x57x93,dr jobber 6.20 hss m2 6.20x63x101,dr jobber 6.50 hss m2 6.50x63x101,dr jobber 7.00 hss m2 7x69x109,dr jobber 7.50 hss m2 7.50x69x109,dr jobber 8.00 hss m2 8x75x117,dr jobber 8.50 hss m2 8.50x75x117,dr jobber 9.00 hss m2 9x81x125,dr jobber 9.50 hss m2 9.50x81x125,dr jobber 10.00 hss m2 10x87x133,dr jobber 10.50 hss m2 10.50x87x133,dr jobber 11.00 hss m2 11x94x142,dr jobber 11.50 hss m2 11.5x94x142,dr jobber 12.00 hss m2 12x101x151,dr jobber 12.50 hss m2 12.5x101x151,dr jobber 13.00 hss m2 13x101x151,dr jobber 13.50 hss m2 13.5x108x160,dr jobber 14.00 hss m2 14x108x160,dr jobber 14.50 hss m2 14.5x114x169,dr
Read moreprov.andlaying of upvc pipe sewer and rcc np3 sands pipe sewer, const. of mhchamber,ips,mps, laying of r.main in lalru const. of stp 1.00 mld, 3.00 mld and 3.50mld including fstp and all other works contingent there to in lalru distt sas nagar.
prov.andlaying of upvc pipe sewer and rcc np3 sands pipe sewer, const. of mhchamber,ips,mps, laying of r.main in lalru const. of stp 1.00 mld, 3.00 mld and 3.50mld including fstp and all other works contingent there to in lalru distt sas nagar.
Read moreP/l of intercepting and di sewer const of ips const of mps laying of rising main and all other works contingent thereto in lalru town distt s.a.s nagar sbm 2.0 scheme const of stp 3.00 mld and 3.50 mld including fstp all other work conting
P/l of intercepting and di sewer const of ips const of mps laying of rising main and all other works contingent thereto in lalru town distt s.a.s nagar sbm 2.0 scheme&#x0d const of stp 3.00 mld and 3.50 mld including fstp all other work conting
Read moreRunning and operation of 120 mld goithaha mps and 7.34 mld narokhar ips varanasi
Running and operation of 120 mld goithaha mps and 7.34 mld narokhar ips varanasi
Read moreof your Industry type