Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tggenco Ytps(5 X800 Mw) Stage I C And I Divisions Supply Of Load Cells For Gravimetric Feeders
|
| Description |
Tggenco Ytps(5 X800 Mw) Stage I C And I Divisions Supply Of Load Cells For Gravimetric Feeders
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-Chief Engineer Civil Construction YTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 05, 2026 23:30 |
| End Date |
Closing soon
12/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays
Tggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays
Read moreTggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor
Tggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor
Read moreTggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.
Tggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.
Read moreTggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreTggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreTggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Tggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Read moreTggenco-ytps-supply of bearings for gravimetric feeder main drive gearbox, coc gearbox, pulleys, rollers and lube oil pumps of hp1103 bowl mills for unit-iii boiler division.
Tggenco-ytps-supply of bearings for gravimetric feeder main drive gearbox, coc gearbox, pulleys, rollers and lube oil pumps of hp1103 bowl mills for unit-iii boiler division.
Read moreof your Industry type