Tender Details

Particulars Details
Title
Balance Work Of For Construction Of Rajaha Akauri Mauhariya Road Length 4.00 Km (Against Agreement No. 40 /Rewa/2019 20 Dated 02 07 2018)
Description
Balance Work Of For Construction Of Rajaha Akauri Mauhariya Road Length 4.00 Km (Against Agreement No. 40 /Rewa/2019 20 Dated 02 07 2018)
Organisation Government of Madhya Pradesh
Tender Id 2023_PWDRB_322580_1
Reference
Number
37/SAC/TENDER/2023-2024
Tender Fee 12500
EMD 1.42 Lakh
Tender Value
Place Chief Engineer PWD Rewa Zone Rewa
Link https://mptenders.gov.in
Start Date December 29, 2023 16:00
End Date

15/01/2024 ( Expired 491 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Independent engineering services for construction of churhat bypass including tunnel on rewa sidhi section of nh 75 e from chainage 33.200 to chainage 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Independent engineering services for construction of churhat bypass including tunnel on rewa sidhi section of nh 75 e from chainage 33.200 to chainage 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Read more
(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.

(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.

Read more
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Read more
Providing and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf

Providing and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf

Read more
Strengthening work of hiraniya tigariya road length 4.00 km.

Strengthening work of hiraniya tigariya road length 4.00 km.

Read more
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state

Read more
Construction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway

Construction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise