Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Of Link Road To Village Buai In Gp From Peej Road Bagan Km. 0/0 To 8/325 Sh Formation Cutting In Km. 7/120 To 7/460, Retaining Wall, Breast Wall, Cross Drainage Work, Unlined Drain, Wire Crates For Dumping And Essential S
|
Description |
Construction Of Balance Work Of Link Road To Village Buai In Gp From Peej Road Bagan Km. 0/0 To 8/325 Sh Formation Cutting In Km. 7/120 To 7/460, Retaining Wall, Breast Wall, Cross Drainage Work, Unlined Drain, Wire Crates For Dumping And Essential S
|
Organisation | Government of Himachal Pradesh |
Tender Id | 2023_PWD_75461_1 |
Reference Number |
No.4658-66 dated 21.06.2023 |
Tender Fee | 5000 |
EMD | 6.88 Lakh |
Tender Value | |
Place | KULLU |
Link | https://hptenders.gov.in |
Start Date | June 24, 2023 22:30 |
End Date |
03/07/2023 ( Expired 705 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u
Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u
Read moreJob 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u
Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u
Read moreRestoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)
Restoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)
Read moreBalance work of m/t on link road to saintari in k.m. 0/00 to 0/500, maintenance of wbm and p/l of 25 mm bc in k.m. 0/00 to 0/335
Balance work of m/t on link road to saintari in k.m. 0/00 to 0/500, maintenance of wbm and p/l of 25 mm bc in k.m. 0/00 to 0/335
Read moreImprovement and strengthening of berghat kathlog gunai road km. 0/00 to 10/900
Improvement and strengthening of berghat kathlog gunai road km. 0/00 to 10/900.(sh rofd, retaining structures, p/l cross drainage works, metalling and tarring v shape drain co parapets and road signage etc in km 000 to 10900) under nabard ridf-xx
Read moreImprovements by widening and strengthening of the road from km 0/0 to 0/280 of nh16 road to gudivada annavaram road over lap of old nh5 and road from km 0/0 to 7/720 ( total length 8.0kms) of gudivada annavaram road(near divisi laboratories ltd) in visakhapatnam district. (balance work) (2nd call)
Improvements by widening and strengthening of the road from km 0/0 to 0/280 of nh16 road to gudivada annavaram road over lap of old nh5 and road from km 0/0 to 7/720 ( total length 8.0kms) of gudivada annavaram road(near divisi laboratories ltd) in visakhapatnam district. (balance work) (3rd call)
Read moreMain work :- formation of approach road till main entrance gate of aiims (eastern road - ball mouth) at km 1/3 of nh-16 ato aiims road in guntur district. sub work :- providing road safety interventions to road from nh-16 to aiims, mangalagiri (east side approach) from km 0/000 to 1/320 in guntur district
Main work :- formation of approach road till main entrance gate of aiims (eastern road - ball mouth) at km 1/3 of nh-16 to aiims road in guntur district. sub work :- providing road safety interventions to road from nh-16 to aiims, mangalagiri (east side approach) from km 0/000 to 1/320 in guntur district
Read moreConstruction of tanda-kohla- tikkari-kawalkot -sidhkothi (via baba balak nath mandir) thapla gobhal galoo road km 0/0 to 5/150 (portion km. 0/0 to 1/300) under nabard ridf- xxvi, distt. mandi (hp).
C/o formation cutting 5/7 mtr. wide, dumping sites, retaining walls, breast walls, cross-drainage work and road side katcha drain etc
Read moreRestoration of rain damages on link road sasan lamlehra pekhubela road km.0.0 to 2.800 (sh c/o retaining wall in rd.2.700 to 2.785) (dc deposit work)
Restoration of rain damages on link road sasan lamlehra pekhubela road km.0.0 to 2.800 (sh c/o retaining wall in rd.2.700 to 2.785) (dc deposit work)
Read moreRepair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50
Repair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50
Read moreof your Industry type