Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Imp.Of Patch Work In Damage Road From Subham Palace To Nandlal Xing Main Road In Ward 84 In Zone 03
|
| Description |
Imp.Of Patch Work In Damage Road From Subham Palace To Nandlal Xing Main Road In Ward 84 In Zone 03
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_NNKAN_856175_1 |
|
Reference Number |
289/A.A.3/23-24 |
| Tender Fee | 590 |
| EMD | 19536 |
| Tender Value | - |
| Place | E.E.3 |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 26, 2023 23:30 |
| End Date |
Expired
30/10/2023
Expired 1079 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of c.c. with patch in defferent palace in main market road at nagar panchayat moosanagar, kanpur-dehat.
Maintenance of c.c. with patch in defferent palace in main market road at nagar panchayat moosanagar, kanpur-dehat.
Read moreWard no. 01 se 03, 52 se 57, 70 me damar patch marmmat karya
Ward no. 01 se 03, 52 se 57, 70 me damar patch marmmat karya
Read moreSection no.de/tp/cbt/pw-03/2025-26 of dts tiruppur-dts kankeyam 24f ofc patch work route
Trenching,hdd and other allied works in section no.de/tp/cbt/pw-03/2025-26 of dts tiruppur-dts kankeyam 24f ofc patch work route
Read moreTender no.(02) ward no.03 bhatta gaon me tempo stand se prathmik vidyalay hote huye nale tak hotmix plant se patch marmmat ka karya.
Tender no.(02) ward no.03 bhatta gaon me tempo stand se prathmik vidyalay hote huye nale tak hotmix plant se patch marmmat ka karya.
Read moreIn ward 81 shakti khand 03, improvement work by cc from man no. 232 to 216, man no. 84 to 79, man no. 102 to 96, 133 to 146 and 163 to 188.
In ward 81 shakti khand 03, improvement work by cc from man no. 232 to 216, man no. 84 to 79, man no. 102 to 96, 133 to 146 and 163 to 188.
Read moreTender no.(03) ward no.58 51 55 44 47 35 57 36 46 49 56 avam anya wardo me hotmix plant dwara pakka patch marmmat ka karya.
Tender no.(03) ward no.58 51 55 44 47 35 57 36 46 49 56 avam anya wardo me hotmix plant dwara pakka patch marmmat ka karya.
Read moreFirewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Firewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Read moreImp.of patch work in damage road from subham palace to nandlal xing main road in ward 84 in zone 03
Imp.of patch work in damage road from subham palace to nandlal xing main road in ward 84 in zone 03
Read moreImp.of patch work in damage road from bholeswar xing to bholeswar puliya in ward 77 in zone 03
Imp.of patch work in damage road from bholeswar xing to bholeswar puliya in ward 77 in zone 03
Read moreImp.of patch work in damage road from bholeswar xing to bholeswar puliya in ward 77 in zone 03
Imp.of patch work in damage road from bholeswar xing to bholeswar puliya in ward 77 in zone 03
Read moreof your Industry type