Tender Details
Particulars | Details |
---|---|
Title |
Const. Rcc Drain Both Side Gandhi Chowk Bazar To Bus Stand Muncipal Area Chhatarpur
|
Description |
Const. Rcc Drain Both Side Gandhi Chowk Bazar To Bus Stand Muncipal Area Chhatarpur
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2024_UAD_388207_1 |
Reference Number |
2880 |
Tender Fee | 5499 |
EMD | 31700 |
Tender Value | |
Place | Muncipal Council Chhatarpur |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=489656 |
Start Date | April 08, 2025 20:00 |
End Date |
26/04/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Area illumination infrastructure work from lallu singh chawk to new bus stand in municipal council shahdol
Area illumination infrastructure work from lallu singh chawk to new bus stand in municipal council shahdol
Read moreConst. bt road ward no 40 muncipal area chhatarpur
Const. bt road ward no 40 muncipal area chhatarpur
Read moreConst. rcc nala ward no 23 narsingarh purwa to hanuman temple muncipal area chhatarpur
Const. rcc nala ward no 23 narsingarh purwa to hanuman temple muncipal area chhatarpur
Read moreConst. cc road and rcc drain ward no 19 muncipal area chhatarpur
Const. cc road and rcc drain ward no 19 muncipal area chhatarpur
Read moreConst. cc road and rcc drain ward no 18 muncipal area chhatarpur
Const. cc road and rcc drain ward no 18 muncipal area chhatarpur
Read moreConstruction of cc road and rcc drain from bus stand to ripta pul
Construction of cc road and rcc drain from bus stand to ripta pul
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreConstruction of rcc drain and cc roa
Construction of rcc drain and cc road from sahu kirana to holi chowk at ward 14
Read moreWork of covering the drain on both sides from itwar bazar to jk builders in ward no. 31, 33 and 34 in area khoda-maknpur with rcc slabs. covering work with slabs and c.c. checkered tiles.
Work of covering the drain on both sides from itwar bazar to jk builders in ward no. 31, 33 and 34 in area khoda-maknpur with rcc slabs. covering work with slabs and c.c. checkered tiles.
Read moreConstruction of rcc drain from shivnagar collony behind of charch both side at ward no 18 tikamgarh
Construction of rcc drain from shivnagar collony behind of charch both side at ward no 18 tikamgarh
Read moreof your Industry type